9
JH INDUSTIRES INC.
WELD
DOCKLEVELER
MOUNTING PLATE
DOCK
(CONCRETE)
MODEL: TPBF12
BEVELED
TRANSITION PLATE
WELD
DOCKLEVELER
MOUNTING PLATE
DOCK
(CONCRETE)
MODEL: TPKF12
KINKED
TRANSITION PLATE
WARNING
!
CURB
CHANNEL
WELD
DOCKLEVELER
MOUNTING PLATE
DOCK
(CONCRETE)
ANCHOR STRAPS
ON 10” CENTERS
FIGURE 5
FIGURE 4
FIGURE 3
INSTALLATION,
CONTINUED
INSTALLATION WITH
FLAT TRANSITION PLATE
1.
Lay the transition plate on top of dock.
2.
If using a beveled transition plate (Model:
TPBF12) position transition plate flush with the
front of dock edge and skip to step 6.
(See Figure
4).
3.
If using a kinked transition plate (Model: TPKF12)
position transition plate flush with the front of dock
edge and mark location of back of transition plate
on floor of dock.
(See Figure 5).
4.
Slide transition plate forward 2” and mark location
of back of transition plate on floor of dock.
5.
Remove transition plate and cut a groove in
concrete 1/2” deep between lines marked in steps
3 & 4.
6.
Tack weld transition plate to angle nosing in at
least four places on 66” & 72” wide EOD’s and six
places on 78” & 84” EOD’s.
7.
Install anchor bolts in the transition plate. All
anchor bolts to be a min. strength in shear of
10,000lbs. Force and a min. of 6,000lbs. Pull out
strength in uncracked concrete. When bolts are
tight in the concrete, remove nuts, cut bolts flush
with top of transition plate, and plug weld bolts to
plate.
All anchor bolts must be installed in accordance
with the manufacturer’s instructions. Improper
installation may result in death or serious injury.
Do not install anchor bolts in cracks or expansion
joints in concrete. Installation in cracks or
expansion joints may cause the anchors to come
loose and pull out. Use of improperly installed
anchor bolts may result in death or serious
injury.
NOTICE!
All anchor bolts to be a min. strength in shear of
10,000lbs. Force and a min. of 6,000lbs. Pull out
strength in uncracked concrete.
8.
Proceed to GENERAL INSTALLATION section on
pages 13 & 14 of this manual.
Summary of Contents for Copperloy EDGE-OF-DOCK SEL Series
Page 2: ......
Page 33: ...33 JH INDUSTIRES INC S1 S2 B A HYDRAULIC SCHEMATICS...