OM131
65
P1939-OM-131 R11
Chapter 4
4.3.2.9 Perform Leak Test
1.
Perform a leak check on the SLS System Backpack as follows:
a.
Connect a single hose between the inhale and exhale hose spigots.
b.
Ensure that the scrubber door is in place and closed tight.
c.
Connect a 10 bar supply to the single stage regulator hose.
d.
Ensure that the gas cylinders are charged to a minimum pressure of 20 bar.
e.
Check for leaks by submerging the SLS System in a tank of water.
2.
If no further maintenance is to be performed, repack the SLS System ready for diving as
follows:
a.
Reload the actuation cable assembly (section 3.4.4).
b.
Recharge the gas cylinders with the appropriate heliox gas mix for the diving depth (section
3.1.1).
c.
Install a refilled scrubber canister and check the door seal (section 3.1.2 and section 3.3.1).
d.
Replace and secure the outer door.
4.3.3
Six monthly maintenance procedures
4.3.3.1 Perform
monthly
maintenance
Carry out the monthly maintenance schedule in accordance with section 4.3.2 of this Manual.
4.3.3.2 Visual inspection of gas cylinders
N
OTE
For use in UK waters, the current legislation for cylinders is detailed in SI 1981:399. This requires
for; a six (6) monthly internal examination by competent personnel, a two (2) yearly hydraulic test in
accordance with BS 5430:1990 and a two (2) yearly pressure leak test in accordance with BS
5430:1990.
Summary of Contents for Divex SLS Mk IV
Page 2: ...Intentionally Blank...
Page 4: ...ii OM131 Approval Sheet P1939 OM 131 R11 Intentionally Blank...
Page 6: ...iv OM131 Preface P1939 OM 131 R11 Intentionally Blank...
Page 8: ...vi OM131 List of Abbreviations P1939 OM 131 R11 Intentionally Blank...
Page 10: ...viii OM131 Warnings P1939 OM 131 R11 Intentionally Blank...
Page 12: ...x OM131 Table of Contents P1939 OM 131 R11 Intentionally Blank...
Page 15: ...OM131 3 P1939 OM 131 R11 Chapter 1 Fig 1 1 SLS System Mk IV...
Page 16: ...4 OM131 Chapter 1 P1939 OM 131 R11 Fig 1 2 SLS system layout...
Page 32: ...20 OM131 Chapter 2 P1939 OM 131 R11 Fig 2 4 Two stage regulator Fig 2 5 Spool valve...
Page 42: ...30 OM131 Chapter 2 P1939 OM 131 R11 Intentionally Blank...
Page 53: ...OM131 41 P1939 OM 131 R11 Chapter 3 Fig 3 3 Hose Lanyards...
Page 54: ...42 OM131 Chapter 3 P1939 OM 131 R11 Fig 3 4 SLS System Mk IV Rear View...
Page 55: ...OM131 43 P1939 OM 131 R11 Chapter 3 Fig 3 5 SLS System Mk IV Front View...
Page 64: ...52 OM131 Chapter 3 P1939 OM 131 R11 Intentionally Blank...
Page 82: ...70 OM131 Chapter 4 P1939 OM 131 R11 Fig 4 7 Annual Maintenance Two Stage Regulator...
Page 86: ...74 OM131 Chapter 4 P1939 OM 131 R11 Fig 4 8 Annual Maintenance Single Stage Regulator...
Page 109: ...OM131 97 P1939 OM 131 R11 Chapter 5 Fig 5 2 Backpack Assembly Drawing P1939229S1...
Page 111: ...OM131 99 P1939 OM 131 R11 Chapter 5 Fig 5 4 Scrubber Housing Assembly Drawing P1939131S1...
Page 118: ...106 OM131 Chapter 5 P1939 OM 131 R11 Fig 5 9 SLS System Mk IV Gas Schematic Drawing P193940S1...
Page 123: ...OM131 111 P1939 OM 131 R11 Chapter 5 Fig 5 14 SLS System Mk IV Bottle Assembly...