96
OM131
Chapter 5
P1939-OM-131 R11
Other useful part numbers include:
These parts are not included in the spares kits. They are noted here for convenience, these parts
should be order as required to replace worn or damaged equipment.
N
OTES
(1) Soft and perishable components have a limited shelf life provided that they are stored in clean,
dry conditions out of direct sunlight and have not been removed from their original packaging.
(2) The total storage period for nitrile rubber goods is 7 years from the rubbers cure date.
(3) The total storage period for viton rubber goods is 10 years from the rubbers cure date.
(4) Rubber goods should be periodically inspected to ensure that no degradation has taken place.
5.2.1
Divex SLS system backpack torque setting
MC111
Circlip, External, 9MM
1
RN1245-7
O-ring
4
RN611-7
O-ring
4
Part No
Description
CA2607
Counterlung
C45800
Counterlung Hose Assembly
C32540
Refillable Sodalime Canister
D328
Cable Wiper Sleeve
D322
Counterlung Enclosure Bush
D267
Valve Seat
Part No
Description
Torque
grm m
Nm
FB032
Demand Regulator Screw (Straight Slot)
2 lbf /i n
23.1
0.23
D2611E
Demand Regulator Seat Retainer Bolt (5/8” AF)
12 lbf / ft
1663
16.4
D4538
Bottle Manifold Banjo Plug (15mm)
10 lbf / ft
1386
13.6
FM299
Bottle Manifold Hex Plug (7/16” AF)
5 lbf / ft
693
6.8
D310
Demand Regulator Banjo Blanking Plug (7/16” AF)
5 lbf / ft
693
6.8
NP103
Umbilical Regulator Plug (14mm)
3 lbf / ft
415.7
4.1
VM049
Plug
5 lbf / ft
693
6.8
-
Inner Side Door
2 lbf / ft
277
2.7
Part No
Description
Qty
Summary of Contents for Divex SLS Mk IV
Page 2: ...Intentionally Blank...
Page 4: ...ii OM131 Approval Sheet P1939 OM 131 R11 Intentionally Blank...
Page 6: ...iv OM131 Preface P1939 OM 131 R11 Intentionally Blank...
Page 8: ...vi OM131 List of Abbreviations P1939 OM 131 R11 Intentionally Blank...
Page 10: ...viii OM131 Warnings P1939 OM 131 R11 Intentionally Blank...
Page 12: ...x OM131 Table of Contents P1939 OM 131 R11 Intentionally Blank...
Page 15: ...OM131 3 P1939 OM 131 R11 Chapter 1 Fig 1 1 SLS System Mk IV...
Page 16: ...4 OM131 Chapter 1 P1939 OM 131 R11 Fig 1 2 SLS system layout...
Page 32: ...20 OM131 Chapter 2 P1939 OM 131 R11 Fig 2 4 Two stage regulator Fig 2 5 Spool valve...
Page 42: ...30 OM131 Chapter 2 P1939 OM 131 R11 Intentionally Blank...
Page 53: ...OM131 41 P1939 OM 131 R11 Chapter 3 Fig 3 3 Hose Lanyards...
Page 54: ...42 OM131 Chapter 3 P1939 OM 131 R11 Fig 3 4 SLS System Mk IV Rear View...
Page 55: ...OM131 43 P1939 OM 131 R11 Chapter 3 Fig 3 5 SLS System Mk IV Front View...
Page 64: ...52 OM131 Chapter 3 P1939 OM 131 R11 Intentionally Blank...
Page 82: ...70 OM131 Chapter 4 P1939 OM 131 R11 Fig 4 7 Annual Maintenance Two Stage Regulator...
Page 86: ...74 OM131 Chapter 4 P1939 OM 131 R11 Fig 4 8 Annual Maintenance Single Stage Regulator...
Page 109: ...OM131 97 P1939 OM 131 R11 Chapter 5 Fig 5 2 Backpack Assembly Drawing P1939229S1...
Page 111: ...OM131 99 P1939 OM 131 R11 Chapter 5 Fig 5 4 Scrubber Housing Assembly Drawing P1939131S1...
Page 118: ...106 OM131 Chapter 5 P1939 OM 131 R11 Fig 5 9 SLS System Mk IV Gas Schematic Drawing P193940S1...
Page 123: ...OM131 111 P1939 OM 131 R11 Chapter 5 Fig 5 14 SLS System Mk IV Bottle Assembly...