OM131
5
P1939-OM-131 R11
Chapter 1
1.3 P
ERFORMANCE
AND
L
IMITATIONS
The SLS System has been proven in extensive unmanned and manned testing. A selection of
unmanned test data is presented below.
1.3.1 Work
of
breathing
Fig 1.3 shows the work of breathing in Joules per Litre as a function of breathing rate in lpm RMV at
a depth of 400 msw using heliox gas. The W.O.B. performance is even better at shallower depths.
The dashed line indicates the maximum W.O.B. permitted within the HSE/NPD Guidelines at >180
msw, the dotted line showing W.O.B. maximum <180 msw.
Fig 1.3 Work of breathing
1.3.2
Oxygen partial pressure / endurance
The duration of the bailout which the SLS System provides depends on one of two factors; the time
taken to fully deplete its stored gas or the life of the CO
2
scrubber canister. The oxygen partial
pressure within the System will vary depending on diver breathing rate. This is illustrated in Fig 1.4
to Fig 1.12 for depths from 50 msw to 500 msw. The System’s cylinder duration can also be seen
from these graphs but it should be noted that at shallow depths duration is limited by the life of the
CO
2
scrubber canister.
With the diver at rest, the oxygen partial pressure rises from its initial value (corresponding to the
umbilical gas) towards 2 bar (pp) At increasing workloads, the oxygen partial pressure is lower, but
at no time falls below 0.2 bar. The System injects gas until such time as the cylinders become
depleted. Following this, the diver will progressively breathe down the oxygen content in the
System. However, it should be noted that the gas remains breathable for some considerable time
beyond exhaustion of the stored gas.
Summary of Contents for Divex SLS Mk IV
Page 2: ...Intentionally Blank...
Page 4: ...ii OM131 Approval Sheet P1939 OM 131 R11 Intentionally Blank...
Page 6: ...iv OM131 Preface P1939 OM 131 R11 Intentionally Blank...
Page 8: ...vi OM131 List of Abbreviations P1939 OM 131 R11 Intentionally Blank...
Page 10: ...viii OM131 Warnings P1939 OM 131 R11 Intentionally Blank...
Page 12: ...x OM131 Table of Contents P1939 OM 131 R11 Intentionally Blank...
Page 15: ...OM131 3 P1939 OM 131 R11 Chapter 1 Fig 1 1 SLS System Mk IV...
Page 16: ...4 OM131 Chapter 1 P1939 OM 131 R11 Fig 1 2 SLS system layout...
Page 32: ...20 OM131 Chapter 2 P1939 OM 131 R11 Fig 2 4 Two stage regulator Fig 2 5 Spool valve...
Page 42: ...30 OM131 Chapter 2 P1939 OM 131 R11 Intentionally Blank...
Page 53: ...OM131 41 P1939 OM 131 R11 Chapter 3 Fig 3 3 Hose Lanyards...
Page 54: ...42 OM131 Chapter 3 P1939 OM 131 R11 Fig 3 4 SLS System Mk IV Rear View...
Page 55: ...OM131 43 P1939 OM 131 R11 Chapter 3 Fig 3 5 SLS System Mk IV Front View...
Page 64: ...52 OM131 Chapter 3 P1939 OM 131 R11 Intentionally Blank...
Page 82: ...70 OM131 Chapter 4 P1939 OM 131 R11 Fig 4 7 Annual Maintenance Two Stage Regulator...
Page 86: ...74 OM131 Chapter 4 P1939 OM 131 R11 Fig 4 8 Annual Maintenance Single Stage Regulator...
Page 109: ...OM131 97 P1939 OM 131 R11 Chapter 5 Fig 5 2 Backpack Assembly Drawing P1939229S1...
Page 111: ...OM131 99 P1939 OM 131 R11 Chapter 5 Fig 5 4 Scrubber Housing Assembly Drawing P1939131S1...
Page 118: ...106 OM131 Chapter 5 P1939 OM 131 R11 Fig 5 9 SLS System Mk IV Gas Schematic Drawing P193940S1...
Page 123: ...OM131 111 P1939 OM 131 R11 Chapter 5 Fig 5 14 SLS System Mk IV Bottle Assembly...