54
OM131
Chapter 4
P1939-OM-131 R11
4.1 S
TORAGE
Do not store under positive pressure, leave inner side door lightly closed.
Always manually check activation after storage and before issuing for diving.
4.2 M
AINTENANCE
SCHEDULES
4.2.1
Weekly maintenance schedule
1.
Clean (See Section 4.3.1.1 for details).
2.
Visual Inspection (See Section 4.3.1.2 for details).
3.
Check spool valve actuation (See Section 4.3.1.3 for details).
4.
Check gas flow from single stage regulator (See Section 4.3.1.4 for details).
4.2.2
Monthly maintenance schedule
These checks must be carried out outwith the Dive system.
1.
Perform weekly maintenance (see above).
2.
Check scrubber door operation and sealing (See Section 4.3.2.2 for details).
3.
Check scrubber canister seal (See Section 4.3.2.3 for details).
4.
Check operation of two stage regulator (See Section 4.3.2.4 for details).
5.
Check operation of single stage regulator (See Section 4.3.2.5 for details).
6.
Check operation of demand regulator (See Section 4.3.2.6 for details).
7.
Replace actuation cable wiper sleeves (See Section 4.3.2.7 for details).
8.
Strip & Service the overpressure indicator (See Section 4.3.2.8 for details).
9.
Perform leak test (See Section 4.3.2.9 for details).
4.2.3
Six monthly maintenance schedule
1.
Perform monthly maintenance (see above).
2.
Visual internal inspection of gas cylinders (See Section 4.3.3.2 for details).
Summary of Contents for Divex SLS Mk IV
Page 2: ...Intentionally Blank...
Page 4: ...ii OM131 Approval Sheet P1939 OM 131 R11 Intentionally Blank...
Page 6: ...iv OM131 Preface P1939 OM 131 R11 Intentionally Blank...
Page 8: ...vi OM131 List of Abbreviations P1939 OM 131 R11 Intentionally Blank...
Page 10: ...viii OM131 Warnings P1939 OM 131 R11 Intentionally Blank...
Page 12: ...x OM131 Table of Contents P1939 OM 131 R11 Intentionally Blank...
Page 15: ...OM131 3 P1939 OM 131 R11 Chapter 1 Fig 1 1 SLS System Mk IV...
Page 16: ...4 OM131 Chapter 1 P1939 OM 131 R11 Fig 1 2 SLS system layout...
Page 32: ...20 OM131 Chapter 2 P1939 OM 131 R11 Fig 2 4 Two stage regulator Fig 2 5 Spool valve...
Page 42: ...30 OM131 Chapter 2 P1939 OM 131 R11 Intentionally Blank...
Page 53: ...OM131 41 P1939 OM 131 R11 Chapter 3 Fig 3 3 Hose Lanyards...
Page 54: ...42 OM131 Chapter 3 P1939 OM 131 R11 Fig 3 4 SLS System Mk IV Rear View...
Page 55: ...OM131 43 P1939 OM 131 R11 Chapter 3 Fig 3 5 SLS System Mk IV Front View...
Page 64: ...52 OM131 Chapter 3 P1939 OM 131 R11 Intentionally Blank...
Page 82: ...70 OM131 Chapter 4 P1939 OM 131 R11 Fig 4 7 Annual Maintenance Two Stage Regulator...
Page 86: ...74 OM131 Chapter 4 P1939 OM 131 R11 Fig 4 8 Annual Maintenance Single Stage Regulator...
Page 109: ...OM131 97 P1939 OM 131 R11 Chapter 5 Fig 5 2 Backpack Assembly Drawing P1939229S1...
Page 111: ...OM131 99 P1939 OM 131 R11 Chapter 5 Fig 5 4 Scrubber Housing Assembly Drawing P1939131S1...
Page 118: ...106 OM131 Chapter 5 P1939 OM 131 R11 Fig 5 9 SLS System Mk IV Gas Schematic Drawing P193940S1...
Page 123: ...OM131 111 P1939 OM 131 R11 Chapter 5 Fig 5 14 SLS System Mk IV Bottle Assembly...