Commissioning of the Vapor Generator
NOTE : The operating instructions folder contains a 3-page operating instruction to be hung in the workspace.
25
1 - Perform the hardness analysis of the water to be used. It must be 0
0
F !!!
Before starting the steam generator, hardness analysis of the water must be performed and
0
0
F
should be seen. The
higher the quality of the water you use, the longer the service life of your steam generator will be. When performing
hardness analysis;
* Fill the sample cup through the sampling valve to the 5 ml line.
(Figure 1)
* Hold the indicator buffer solution upright, drip 3 drops and shake.
(Figure 2)
* Test is completed when the water in the sample cup is green.
(Figure 3)
Figure 1
Figure 2
Figure 3
A) Controls Which Must Be Done Before Start-Up
Summary of Contents for SHS 1000
Page 10: ...Steam Distribution Connection Diagram 10 Buhar Da l m Kollekt r...
Page 12: ...Condensate Return Connection Diagram 12...
Page 15: ...15 Vent Connection and Blowdown Connection Diagram...
Page 55: ...55...
Page 56: ...56...