PLACEMENT & CONNECTIONS
✓
WARNING!!! For the commissioning of your steam generator, several assemblies and
connections must be made on site. You must send the photos of the gas opening certificate
and the installations / connections made on site (steam installation, condensate
installation, water installation, electricity installation, blowdown
installation and
smokestack connection) to our company.
5
✓
The steam generator must be located in
a well-ventilated, frost-free enclosure.
✓
The area where the steam generator is
located should be a place with good air
circulation.
✓
When positioning the steam generator,
it must be placed in such a way that the
device can be intervened on all four sides.
a
–
Placement of the Vapor Generator