3/132
5.1.3, 5.2 ISO 10 240
The users of the boat are informed of the following:
- The entire crew must be trained properly.
- The boat shall not be loaded more with than the maximum load recommended by the builder, in
particular the total weight of the food supplies, of the different equipment that are not supplied by
the builder and of the persons on board. The weight of the boat shall be properly distributed.
- The water in the bilge shall be kept at its minimum.
- The stability is reduced when you add weight in the upper parts.
- In case of heavy weather, the hatches, lockers and doors shall be closed in order to minimize the
risk of water coming in.
- The stability may be reduced when you tow a boat or when you lift heavy weights with the davits
or the boom.
- Breakers are serious dangers to stability.
- If your boat is equipped with a liferaft, carefully read the instructions. In the boat there shall be all
the proper safety equipment (harness, flares, liferaft etc.) depending on the type of boat, the
country, the weather
- The crew must be familiar with the use of all the safety equipment and the emergency safety
procedures (MOB, towing etc.).
- Anyone on the deck shall wear a life jacket or a buoyancy aid. Please note that in some countries
it is compulsory to wear an homologated buoyancy aid permanently.
- A part of the data is shown on the builder's plate fixed to the boat. The explanation of these data
is given in the appropriate chapters of this manual.
Keep this manual in a safe place and hand it over to the new owner if you sell your boat.
Summary of Contents for SUN ODYSSEY 42 DS
Page 1: ...SUN ODYSSEY 42 DS OWNER S MANUAL C ROISIERE...
Page 2: ......
Page 4: ...5 1 3 5 2 ISO 10 240 HISTORY OF UPDATES Index 0 08 2005...
Page 8: ......
Page 16: ......
Page 24: ......
Page 26: ......
Page 28: ...24 132 5 3 3 h ISO 10 240 EMERGENCY TILLER NOTE See page 46 Steering Gear...
Page 30: ......
Page 32: ......
Page 36: ......
Page 38: ......
Page 40: ......
Page 44: ......
Page 46: ......
Page 48: ......
Page 52: ......
Page 72: ......
Page 74: ......
Page 75: ...71 132 5 3 5 4 5 5 ISO 10 240 ACCOMMODATIONS MAINTENANCE FABRICS 6...
Page 76: ...72 132 5 3 1 ISO 10 240...
Page 78: ......
Page 80: ......
Page 82: ......
Page 84: ......
Page 100: ......
Page 102: ......
Page 104: ...100 132 5 3 3 b 5 5 1 ISO 10 240 SHORE POWER...
Page 106: ......
Page 110: ...106 132 5 3 3 c 5 3 3 k 5 5 1 ISO 10 240 FUEL VALVE 1 Fuel oil valve for engine...
Page 114: ......
Page 116: ......
Page 118: ...114 132 POSITION OF THE LEAD LINES hj Lead lines Log and speedometer...
Page 122: ......
Page 123: ...119 132 5 2 5 3 5 4 ISO 10 240 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 10...
Page 124: ......
Page 126: ......
Page 128: ......
Page 129: ...125 132 5 3 5 4 5 5 ISO 10 240 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11...
Page 130: ......
Page 132: ......
Page 134: ......
Page 136: ......