
51/132
STANDING RIGGING
Your JEANNEAU dealer was responsible for stepping the mast of your boat.
To mast or unstep the mast yourself, proceed as follows:
BEFORE MAST INSTALLATION
- Protect the mast against possible chafing by the crane hook and cable.
- Tie down the shrouds and all the riggings to the base of the mast with a lashing long enough to
guide the mast heel when stepping the mast.
- Protect the spreader end fittings and the roller furler drum.
- Put a rope of about 1,50 m with an eye and thimble at both ends and covered with rags round the
mast. Place the rope under the second tier of spreaders. Link together both thimbles (that are ahead
of the mast) with a shackle large enough to receive the crane hook. Raise the whole till it is taut
under the spreader bases.
DURING MAST INSTALLATION
- Take the necessary steps to avoid damaging the mast head equipments.
- Use the backstay and lashing at the base of the mast to control the handling.
- Make sure the base of the mast integrally bears on its base plate.
DANGER
Before you lift the mast, make sure you have room that is clear enough
(Risk of electrocution when in contact or near electric cables).
5
RIGGING AND SAILS
Summary of Contents for SUN ODYSSEY 42 DS
Page 1: ...SUN ODYSSEY 42 DS OWNER S MANUAL C ROISIERE...
Page 2: ......
Page 4: ...5 1 3 5 2 ISO 10 240 HISTORY OF UPDATES Index 0 08 2005...
Page 8: ......
Page 16: ......
Page 24: ......
Page 26: ......
Page 28: ...24 132 5 3 3 h ISO 10 240 EMERGENCY TILLER NOTE See page 46 Steering Gear...
Page 30: ......
Page 32: ......
Page 36: ......
Page 38: ......
Page 40: ......
Page 44: ......
Page 46: ......
Page 48: ......
Page 52: ......
Page 72: ......
Page 74: ......
Page 75: ...71 132 5 3 5 4 5 5 ISO 10 240 ACCOMMODATIONS MAINTENANCE FABRICS 6...
Page 76: ...72 132 5 3 1 ISO 10 240...
Page 78: ......
Page 80: ......
Page 82: ......
Page 84: ......
Page 100: ......
Page 102: ......
Page 104: ...100 132 5 3 3 b 5 5 1 ISO 10 240 SHORE POWER...
Page 106: ......
Page 110: ...106 132 5 3 3 c 5 3 3 k 5 5 1 ISO 10 240 FUEL VALVE 1 Fuel oil valve for engine...
Page 114: ......
Page 116: ......
Page 118: ...114 132 POSITION OF THE LEAD LINES hj Lead lines Log and speedometer...
Page 122: ......
Page 123: ...119 132 5 2 5 3 5 4 ISO 10 240 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 10...
Page 124: ......
Page 126: ......
Page 128: ......
Page 129: ...125 132 5 3 5 4 5 5 ISO 10 240 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11...
Page 130: ......
Page 132: ......
Page 134: ......
Page 136: ......