65/132
FURLING GENOA
Before getting under way take advantage of a windless period of time and hoist the genoa.
Hand pre-roll the drum to set the furling line on it.
Pay attention to the drum winding direction: The sacrificial strip of the genoa shall be wrapped outside.
- Secure the head and halyard to the swivel. Secure the tack to the drum and sheets.
- Insert the bolt rope into the hole and hoist it and take care that you do not tear it.
- Have the halyard taut enough but hoist less taut than a sail on a normal stay. Hoist it until the
horizontal creases disappear (Adjust the tension of the luff after a few sea trips).
- Pull on the line from the cockpit to furl the genoa.
Never force it in case it seizes when you furl or unfurl the head sails. Make sure a halyard is not jammed
in the furler.
ADVICE: When you are not sailing, slacken the genoa halyard.
MAINTENANCE
- Regularly rinse the drum and swivel.
- Lubricate the bearings if recommended by the manufacturer.
- Unrig the sails if your boat is not to be used for long.
LAZY-BAG (OPTIONAL EXTRA)
- Spread out the lazy-bag on the deck.
- Slide the battens in and close the batten pockets.
- Hank on the lazy-bag until you have the front part about level with the gooseneck.
- Fasten the lazy-bag to the tack with the strap provided.
- Stretch the lazy-bag from the back before you fasten the lazy-jacks.
- Tighten up the port side.
- Put the mainsail into the lazy-bag.
- Tighten up the starboard side.
ADVICE: Install the lazy-bag before the mainsail.
5
RIGGING AND SAILS
Summary of Contents for SUN ODYSSEY 42 DS
Page 1: ...SUN ODYSSEY 42 DS OWNER S MANUAL C ROISIERE...
Page 2: ......
Page 4: ...5 1 3 5 2 ISO 10 240 HISTORY OF UPDATES Index 0 08 2005...
Page 8: ......
Page 16: ......
Page 24: ......
Page 26: ......
Page 28: ...24 132 5 3 3 h ISO 10 240 EMERGENCY TILLER NOTE See page 46 Steering Gear...
Page 30: ......
Page 32: ......
Page 36: ......
Page 38: ......
Page 40: ......
Page 44: ......
Page 46: ......
Page 48: ......
Page 52: ......
Page 72: ......
Page 74: ......
Page 75: ...71 132 5 3 5 4 5 5 ISO 10 240 ACCOMMODATIONS MAINTENANCE FABRICS 6...
Page 76: ...72 132 5 3 1 ISO 10 240...
Page 78: ......
Page 80: ......
Page 82: ......
Page 84: ......
Page 100: ......
Page 102: ......
Page 104: ...100 132 5 3 3 b 5 5 1 ISO 10 240 SHORE POWER...
Page 106: ......
Page 110: ...106 132 5 3 3 c 5 3 3 k 5 5 1 ISO 10 240 FUEL VALVE 1 Fuel oil valve for engine...
Page 114: ......
Page 116: ......
Page 118: ...114 132 POSITION OF THE LEAD LINES hj Lead lines Log and speedometer...
Page 122: ......
Page 123: ...119 132 5 2 5 3 5 4 ISO 10 240 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 10...
Page 124: ......
Page 126: ......
Page 128: ......
Page 129: ...125 132 5 3 5 4 5 5 ISO 10 240 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11...
Page 130: ......
Page 132: ......
Page 134: ......
Page 136: ......