123/132
HOISTING
- Install a fore rope, a rear rope and fenders.
- When craning, check that no device is crushed by the belts (sounder, speedometer, shaft, etc.).
- Mark the belt position with adhesive tape on the toe rail (most of the boats are already fitted with
these stickers). The belt position will be useful during the craning for a future launching.
- The crane hook will be fitted with a gantry or a spacer with two belts. The belts shall not be hooked
directly on the hook, since it would result in unusual compressive stresses on the hull.
- Hoist slowly. Control the movement of the boat with ropes.
AFTER LAUNCHING
- Check the sounder and speedometer fittings for tightness if need be.
- Open the valves and make sure that they are tight with the hull and relevant hose.
- Check the stuffing box for watertightness (Refer to chapter 9 "Stuffing box").
- Before starting the engine, refer to chapter 9 "Engine".
STEPPING THE MAST
Refer to chapter 5 "Rigging and Sails".
WARNING
Do not stay on board or under the boat during hoisting.
10
LAUNCHING
Summary of Contents for SUN ODYSSEY 42 DS
Page 1: ...SUN ODYSSEY 42 DS OWNER S MANUAL C ROISIERE...
Page 2: ......
Page 4: ...5 1 3 5 2 ISO 10 240 HISTORY OF UPDATES Index 0 08 2005...
Page 8: ......
Page 16: ......
Page 24: ......
Page 26: ......
Page 28: ...24 132 5 3 3 h ISO 10 240 EMERGENCY TILLER NOTE See page 46 Steering Gear...
Page 30: ......
Page 32: ......
Page 36: ......
Page 38: ......
Page 40: ......
Page 44: ......
Page 46: ......
Page 48: ......
Page 52: ......
Page 72: ......
Page 74: ......
Page 75: ...71 132 5 3 5 4 5 5 ISO 10 240 ACCOMMODATIONS MAINTENANCE FABRICS 6...
Page 76: ...72 132 5 3 1 ISO 10 240...
Page 78: ......
Page 80: ......
Page 82: ......
Page 84: ......
Page 100: ......
Page 102: ......
Page 104: ...100 132 5 3 3 b 5 5 1 ISO 10 240 SHORE POWER...
Page 106: ......
Page 110: ...106 132 5 3 3 c 5 3 3 k 5 5 1 ISO 10 240 FUEL VALVE 1 Fuel oil valve for engine...
Page 114: ......
Page 116: ......
Page 118: ...114 132 POSITION OF THE LEAD LINES hj Lead lines Log and speedometer...
Page 122: ......
Page 123: ...119 132 5 2 5 3 5 4 ISO 10 240 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 10...
Page 124: ......
Page 126: ......
Page 128: ......
Page 129: ...125 132 5 3 5 4 5 5 ISO 10 240 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11...
Page 130: ......
Page 132: ......
Page 134: ......
Page 136: ......