129/132
ENGINE
The engine winterization shall be carried out by a professional. Depending on the boat location, afloat
or ashore, winterization is different.
Here are a few major tasks to carry out:
Afloat
- Drain the cooling system and fill it with antifreeze.
- Switch off the battery switches, lubricate the terminals with vaseline and check the battery voltage.
- Change the anode.
- Fill the fuel tanks to a maximum in order to avoid condensation.
- Please refe to the engine manual for anything relating to the engine.
Ashore
- Take the batteries ashore and keep them on maintenance charge.
- Drain all the cooling, exhaust, oil and fuel systems.
- Carry out the winterization operations specified by the manufacturer, keeping in mind that the
freeze hazard is more significant when the boat is ashore.
- Remove and lubricate the thru-hull fittings with valves of the cooling systems, leave them open
and check the hoses.
- Slacken the a.c. generator and pump belts.
11
WINTER STORAGE
Summary of Contents for SUN ODYSSEY 42 DS
Page 1: ...SUN ODYSSEY 42 DS OWNER S MANUAL C ROISIERE...
Page 2: ......
Page 4: ...5 1 3 5 2 ISO 10 240 HISTORY OF UPDATES Index 0 08 2005...
Page 8: ......
Page 16: ......
Page 24: ......
Page 26: ......
Page 28: ...24 132 5 3 3 h ISO 10 240 EMERGENCY TILLER NOTE See page 46 Steering Gear...
Page 30: ......
Page 32: ......
Page 36: ......
Page 38: ......
Page 40: ......
Page 44: ......
Page 46: ......
Page 48: ......
Page 52: ......
Page 72: ......
Page 74: ......
Page 75: ...71 132 5 3 5 4 5 5 ISO 10 240 ACCOMMODATIONS MAINTENANCE FABRICS 6...
Page 76: ...72 132 5 3 1 ISO 10 240...
Page 78: ......
Page 80: ......
Page 82: ......
Page 84: ......
Page 100: ......
Page 102: ......
Page 104: ...100 132 5 3 3 b 5 5 1 ISO 10 240 SHORE POWER...
Page 106: ......
Page 110: ...106 132 5 3 3 c 5 3 3 k 5 5 1 ISO 10 240 FUEL VALVE 1 Fuel oil valve for engine...
Page 114: ......
Page 116: ......
Page 118: ...114 132 POSITION OF THE LEAD LINES hj Lead lines Log and speedometer...
Page 122: ......
Page 123: ...119 132 5 2 5 3 5 4 ISO 10 240 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 10...
Page 124: ......
Page 126: ......
Page 128: ......
Page 129: ...125 132 5 3 5 4 5 5 ISO 10 240 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11...
Page 130: ......
Page 132: ......
Page 134: ......
Page 136: ......