INSTALLATION

See the 

USER MAINTENANCE INSTRUCTIONS 

section 

of this owner’s manual, prior to installation, for humidity and 
mold prevention suggestions.

1.  

Finish Frame:

 A finish frame under the shell rim 

should also always be constructed to support the bath 
deck and ensure proper drainage toward the bath 
well. This frame is not intended to support the full bath 
weight 

(see Figures 1 & 2).

 

Jason offers a removable lateral skirt for most baths.
The skirts are available in matching acrylic colors 
and provide convenient access to bath equipment, as 
well as an excellent finished appearance. However, 
if Jason’s lateral skirt is not used, an access 
panel MUST be provided to enable final electrical 
connections and service. Please refer to the minimum 
recommended access panel size listed in the 
Equipment Access Section of this manual.

 

If a Jason lateral skirt is to be used, the bath deck 
must be leveled at 20.5" (52cm) from the support floor 
or the skirt will not fit properly.

 

Allow ample clearance for the equipment.

 

CAUTION: Ambient temperature under the bath 
where equipment is installed must not exceed 
122°F (50°C).

2.   100% Silicone with mildew resistant properties should 

be applied between the water-resistant backer board 
and the deck of the bath. 

NOTE:

 If you use a tile 

flange kit, modify the framing to support the bath lip as 
shown in 

Figure 1

3.   A minimum ventilation opening of 2" x 4" (5 x 10 cm) 

for the blower is required, and should be designed 
to draw in indoor ambient air at a minimum 
of 72°F (22°C).

4.   Install the drain and overflow assembly to the bath 

INSTALLATION INSTRUCTIONS

shell according to the instructions provided with the 
drain and position the bath in the area of intended 
installation.

5.   Finish plumbing rough-in of drain and overflow assem-

bly. At this time, considerations should be made for the 
position and mounting of the faucet set, as well as all 
related plumbing.

6.  

Remove the packing board before installing the 
bath. 

The bath is equipped with separate bath equip-

ment support bases which are joined for shipment with 
packing boards. Detach the packing board from the 
bath and from underneath the equipment.

 

WARNING: Any modification to the equipment is 
not recommended and will void the Manufactur-
er’s warranty

.

7. 

Install the bath level for proper drainage.

 Jason 

baths are designed to be supported at the base of the 
bath. If the floor is smooth and level, the baths’ Level 
Form™ Base will provide proper drainage and support 

(See Figure 3).

8.   Mortar is required when the subfloor is not smooth 

and level, when additional sound insulation is desired, 
or when the bath is installed in a drop-in application. 
In alcove installations, a bed of mortar may also be 
recommended to aid in leveling the bath. 

NOTE: 

Do 

not use a sand bed to install or level the bath.

9.  

Secure the bottom of all equipment mounts so that it 
is level with the bottom of the bath.

 Position the bath 

in the area of intended installation and cut the equipment 
support strap(s) to allow the equipment to rest firmly on the 
floor. We recommend securing the equipment mounts to 
the floor with removable fasteners for ease of servicing.

Figure  1

Figure  2

Summary of Contents for forma Designer MicroSilk AirMasseur

Page 1: ...responsible for ensuring that the unit is free from defects or shipping damage In the event of a problem DO NOT install the unit Jason International is not responsible for damage that might have been...

Page 2: ...minimum ventilation opening of 2 x 4 5 x 10 cm for the blower is required and should be designed to draw in indoor ambient air at a minimum of 72 F 22 C 4 Install the drain and overflow assembly to t...

Page 3: ...ration and Maintenance manual of the separately packaged MicroSilk hydrotherapy bath unit Full Support B ase Figure 3 Figure 4 WARNING SYSTEM UNDER PRESSURE NEVER PERFORM MAINTENANCE WHILE SYSTEM IS R...

Page 4: ...ed following E T L Guidelines During installation if remote mounting of the blower is desired or required the following procedures should be followed NOTE Do not remote mount the blower more than 15 f...

Page 5: ...Control Box The MicroSilk generator unit may be shippedseparatefromthebath Followtheinstructionsfor theMicroSilk PumpAssemblyFieldInstallationinthe Installation section of this owner s manual instruc...

Page 6: ...Standard Premier Edition Signature Edition Sani Design C leaning Syst em B lower C ont rol B oxes C ont rol Mount L2 L1 GROUND DEDIC ATED 2 4 0 V 5 0 or 6 0 Hz GFC I PROTEC TED SERVIC E NOTE USE THE A...

Page 7: ...e during installation to minimize cleanup and prevent surface damage WATER TESTING Before finishing the installation it is recommended that the bath be water tested and the plumbing tested for leaks 1...

Page 8: ...f Ugtxleg Hgocng Pgoc Nqcf Eqppgevlqp MgCrcf aKFW 288b Dnqygt OU Swor Ocng Pgoc Nlpg Eqppgevlqp MgCrcf Ecdng aEDN 169b Transducer Cables Transducer Cables PqvguB C Ulping Fgflecvgf 120X 60JD 20C IHEK...

Page 9: ...system see note B The MicroSilk pump s power cord should be plugged into the female cord connection on the ozone unit prewired to the control box C Eight pinmini DINterminalfortheMicroSilk AirMasseur...

Page 10: ...B The MicroSilk pump s power cord should be plugged into the female cord connection on the ozone unit prewired to the control box C Eight pinmini DINterminalfortheMicroSilk AirMasseur Keypad D The bl...

Page 11: ...ute pause before the purge cycle begins Once the purge cycle begins all indicators will light and the keypad operation will be disabled for two 2 minutes SIGNATURE EDITION MICROSILK AIRMASSEUR The Jas...

Page 12: ...es 50mm above the jets The inlet temperature should not exceed 40 C 104 F When bath is in use turn the unit Off before draining the water The bath unit and its plumbing are designed to drain after eac...

Page 13: ...gh speed mode Pressing the icon again begins the wave mode indicated by a slow flashing light Pressing the icon a third time will change the blower to pulse mode This is indicated by a rapid light fla...

Page 14: ...2 seconds to turn the lights Off or On Hold the key for more than two 2 seconds to change modes The Light icon should remain lit as long as the bath is connected to a power supply This function has a...

Page 15: ...ll ensure a quick response on warranty items The serial number can be found on the front page of this manual or on the small card adhered to the back of the bath just above the equipment ALL WARRANTY...

Page 16: ...a Refer to installer dealer b Refer to installer dealer Pump operates but water is not being pumped a Suction or discharge blocked b Suction air leak System usually surges a Remove obstruction b Make...

Page 17: ...cted c Check and reconnect if necessary Blower shuts off by itself or before time elapses a Blower motor overheated and thermal protection device deactivated motor possibly low voltage a Check that bl...

Page 18: ...er use the therapy bath while under the influence of alcohol anticoagulants stimulants antihistamines vasoconstrictors vasodilators hypnotics narcotics or tranquilizers F Persons with a medical histor...

Reviews: