Page 86
J-400
7. Now you are ready to clean or replace the quartz tube (2). For the
cleaning of the quartz tube (2), follow steps 8 and 9 then proceed to
step 10. For replacing of the quartz tube (2), skip steps 8 and 9 and
proceed to step 10.
8.
Cleaning quartz tube:
Clean the quartz tube by wiping until clear
using a paper towel or a dry cotton cloth. If needed a household tub
and shower lime removal product can be used.
WARNING:
Do not use abrasive cleaners as they can
scratch the quartz tube surface.
!
9. Rinse the quartz tube with clean water to completely remove any
cleaning products that were used in step 4.
10.
Replacing quartz tube:
You will notice that the new quartz tube
does not have a black cushion on the domed end as the old quartz
tube does. This is normal as the cushion was provided with the
original quartz tube to protect it from breakage during transportation.
Install the black seal ring (13) over the opened end of the quartz
tube. Place the new quartz tube (2) into the water chamber (1) with
the domed end first making sure it is inserted and seated inside the
quartz end holder. Only a small portion will be exposed when it is
seated correctly.
11. Reinstall the compression washer (6) over the open end of the quartz
tube (2). Push it against the quartz black seal ring (13).
12. Reinstall and hand tighten the quartz seal compression nut (7) by
turning it
clockwise
.
13. Refill your spa.
14.
System Test 1:
Assure there is no water dripping from the seal
compression nut (7). If water is visible, STOP and tighten the
compression nut (7) using a pair of channel lock pliers to a maximum
of 1/4 turn. If that does not fix the leak, then repeat quartz tube
maintenance process from step 1 through step 13. Make sure there
is no water leaking before proceeding to step 15.
15.
System Test 2:
Reconnect the CLEAR
RAY
System to the controller.
Turn breaker back ON and turn on the pump to circulate the water
through the CLEAR
RAY
System. Wait for 5 minutes and assure no
water is dripping. If water is visible, STOP, fix the leak by repeating
quartz tube maintenance process from step 1 through step 14.
Make
sure there is no water visi
ble. Turn the pump and breaker OFF,
and disconnect the
CLEAR
RAY System from the controller
BEFORE proceeding to step 16.
16. Reconnect the bulb socket (5) to the new UV bulb (4) make sure you
use the latex glove provided when handling the UV bulb.
Note:
Align pins on UV bulb (4) to the receptacle holes on the bulb socket
(5) before inserting the pins completely into socket holes. Failure to do so
will damage the UV bulb.