) Assemble the bracket on the frame and, after having
checked the perpendicularity, attach it to the wall.
(
detail 1
)
Given that the perpendicularity of the frame will
be adjusted after assembling the external cornice, we rec-
ommend not fully tightening the screw (V) .
Installing glass panels
Q
(
11
) Place the profile inside the compensator and resting
on the tray; check that the distance with regards the inner tray
rim is equal to the distance between the panel frame profile and
the rim itself.
After having checked the perpendicularity, attach the profile to
the wall.
ATTENTION: when moving glass panels, ONLY use suc-
tion lifters, suited to hold the weight of the glass pan-
els. Also use suitable protective gloves.
Q
(
12
) Insert the glass, as indicated, inside the panel frame;
let it slide across the entire length, to the very edge of the op-
posite profile.
Q
(
13
) Insert the second glass inside the profile, attached to
the tray base and let it slide across the entire length, to the edge,
of the vertical profile.
ATTENTION: check that the glass side displaying the
label faces inwards towards the inside of the shower
enclosure.
Installing the cornice
Q
(
14
) Remove the vertical element which will be positioned
on the wall (drain side) and attach the bracket to the upper part
of this same element
(NB: in the instance where you are assem-
bling a cornice to a horizontal surface, the bracket may be attached
at a later stage).
The vertical element does not feature a magnetic profile (M).
Remove the lower element (identifiable owing to the two holes
present on the internal part) and thread the short, metal dowel
inside the element itself.
Q
(
15
) Remove the remaining vertical element and the up-
per element. Place silicone, as indicated, on the lower profile and
assemble the elements, checking connections for breakages. At-
tach the elements together.
Q
(
16
) Working from the inside, place a line of silicone on
the lower cornice element; hook up the cornice to the screws
present on the tray.
Q
(
17
) Check the perpendicularity of the panel frame and
permanently fix the screws (V).
Insert the cornice to the glass (A) and panel (B), right up to the
edge; attach the cornice bracket to the panel frame bracket.
Installing the roof
Q
(
18a-18b-18c
) Remove the protective film and attach the
profile to the roof, checking that it is flush. Apply the gasket.
The hole arrangement varies depending on the installation
corner type.
Q
(
19
) Apply lubricant material (e.g. vaseline) to the panel-
frame joints (to facilitate subsequent panel installation).
Then apply the spacers to the glass profiles and assemble
the roof, so that it links up with the glass and the panel-frame.
Ensure you hook the roof in the grooves present on the up-
per cornice element.
Hydraulic and electrical connections
Q
(
20
) Draw the panel to the brassware and connect the
brassware to the wall connections.
Also assemble the shower door shutter.
Carry out the following connections:
- with the shower head (A);
- with the waterfall (B);
- with the spray jets (C).
Q
(
21, part.1
) Connect the light cable coming from its re-
spective box to the box present on the roof.
Carry out the following connections:
- with the equipotential terminal board;
- with the emergency alarm circuit (see also the relative chapter);
- with the building's electrical supply system.
Also refer to the wiring diagram.
IMPORTANT:
for Countries where 220-240V voltage is
supplied by a two-phase system (L+L), the connection
has to be made on terminals L and N anyway.
We recommend using clamps to gather tubes and cables (
21) and checking that no obstacles which could hinder as-
sembly and attachment of the panel (see
22) are present.
Q
Connecting the alarm (where necessary)
There are two terminals inside the electric control box (designated
with “ALL”)
to which the alarm circuit should be connected; these
terminals are open contacts powered by a relay.
- When the “alarm” key is pressed, a relay inside the electric con-
trol box activates the emergency call device for approximately
15 seconds. The call warning (alarms, buzzers, lamps, etc.) may
be powered to either 220/240 V or low voltage, however with
maximum power absorption equal to 5 A.
- The alarm circuit connection must incorporate a cable with
characteristics not inferior to
H 05 VV-F 2x0,75 mm
2
. This cable
type must be used in order to ensure that the cable clamp at-
tached to the box provides adequate protection as specified by
legislation.
8
Summary of Contents for frame 100
Page 17: ...17 2 1 SX DX 3 4 M6x10 6 4x12 SX SX DX DX DX SX M8 8 4x17 1 2...
Page 18: ...18 1 2 4 3 3 1 2 2 2 2 3 4 4...
Page 19: ...19 2 3 1 4 6 mm 5 6 4 2x32 5 3x10 14 mm 5...
Page 20: ...20 1 3 6 mm 4 2 5 6 C 4 2x32 5 3x10 6...
Page 21: ...21 1 DX 3 DX 2 2 7a...
Page 22: ...22 1 2 3 SX 2 7b...
Page 23: ...23 1 OK 2 2 2 8...
Page 24: ...24 3 mm 3 3 5x13 1 4 OK 2 9...
Page 25: ...25 2 6 mm 4 3 5 4 2x32 5 3x10 M6x16 1 6 4x12 V 10...
Page 26: ...26 1 1 2 3 mm 3 5x13 3 11...
Page 27: ...27 1 1 2 3 OK 12...
Page 28: ...28 1 2 1 2 OK 13...
Page 29: ...29 M DX SX 1 3 9x13 14...
Page 30: ...30 4 2x45 3 2 2 1 2 2 4 4 2x45 OK 15...
Page 31: ...31 2 1 16...
Page 32: ...32 4 4 3 5 M6x16 1 V 2 3 5x13 DX OK 18a 17...
Page 33: ...33 3 5x13 SX OK 18b 1 2 4 4 3 5 6 6 18c...
Page 34: ...34 3 1 2 4 19...
Page 35: ...35 A A C B C B OK M4x70 20...
Page 36: ...36 1 220 240V 50 60 Hz 220 240V 12 24V 12 24V ALL 21 antenna aerial antenne Antenne antena...
Page 38: ...38 5 5 3 4 3 2 1 22...
Page 39: ...39 2 3 3 1 A B A B 1 3 4 2 1 3 OK 23 24...
Page 40: ...40 1 4 C B 2 3 3 9x13 1 5 C C B 25...
Page 41: ...41 4 4 5 6 3 1 2 26...
Page 42: ...42 1 1 3 5 5 3 M M 6 6 7 7 x5 x5 5 mm 2 5 mm 5 mm 4 5 mm 27...
Page 43: ...43 2 OK 1 4 3 28...
Page 44: ...44 1 4 3 2 5 5 29...
Page 45: ...45 1 1 2 3 4 2 3 4 30...
Page 46: ...46 F C 31...
Page 59: ...59...