38
This section describes pump operation and setting. Run the pump after
plumbing and wiring are completed.
%HIRUHRSHUDWLRQ
First check piping and wiring are correct. And then make commissioning before starting op-
eration.
Points to be checked
Before operation, check if:
/LTXLGOHYHOLQDVXSSO\WDQNLVHQRXJK
• Piping is securely connected and is free from leakage and clogging.
• Discharge/suction valves are opened.
• Power voltage range is correct.
• Electrical wiring is correct and is free from the risk of short circuit and electrical leakage.
5HWLJKWHQLQJRISXPSKHDG¿[LQJEROWV
,PSRUWDQW
7KHSXPSKHDG¿[LQJEROWVPD\ORRVHQZKHQSODVWLFSDUWVFUHHSGXHWRWHPSHUDWXUHFKDQJHLQVWRUDJHRULQ
WUDQVLWDQGWKLVFDQOHDGWROHDNDJH%HVXUHWRUHWLJKWHQWKHEROWVHYHQO\WRWKHVSHFL¿HGWLJKWHQLQJWRUTXH
below in diagonal order before starting operation.
7LJKWHQLQJWRUTXH
Model code
7RUTXH
Bolts
Number of bolts
IX-B007/-B015/-B030/-B045
3 N•m
M5 hexagon head bolt
4
7LJKWHQ¿[LQJEROWVRQFHHYHU\WKUHHPRQWKV
Operation