228A
241
370F
370D
423
134
370C
2. Remove the clamp screws (370C) and back off the jam nuts (423).
3. Tighten the jack screws (370D) evenly to move the bearing housing (134) out of the bearing frame
(228A).
4. Remove the shaft assembly from the bearing frame (228A).
5. Remove the jack screws (370D), the nuts (423), and the bearing housing O-ring.
6. Remove the inboard bearing (168A).
122
168A
248A
112A
136
382
253B
7. Remove the bolts (371C), the bearing end cover (109A), and the gasket (360C).
8. Remove the outboard labyrinth oil seal (332A) from the end cover (109A).
9. Remove the O-rings (497F and 497G) if it is necessary.
Labyrinth oil-seal O-rings are part of the 3196 maintenance kits, and they are sold separately.
109A
332A
371C
360C
10. Remove the bearing housing (134) and the bearing (112A) from the shaft (122).
Maintenance
Model HT 3196 i-FRAME Installation, Operation, and Maintenance Manual
79
Summary of Contents for HT 3196 i-FRAME
Page 1: ...Goulds Pumps Installation Operation and Maintenance Manual Model HT 3196 i FRAME ...
Page 2: ......
Page 147: ......