This illustration is an example of priming the pump with a foot valve and an outside supply:
1
2
3
4
5
1.
Discharge isolation valve
2.
Shutoff valve
3.
From outside supply
4.
Foot valve
5.
Check valve
This illustration is an example of priming the pump with a foot valve using a bypass around the check
valve:
1
2
3
4
5
1.
By-pass line
2.
Shutoff valve
3.
Foot valve
4.
Check valve
5.
Discharge isolation valve
Commissioning, Startup, Operation, and Shutdown
Model HT 3196 i-FRAME Installation, Operation, and Maintenance Manual
55
Summary of Contents for HT 3196 i-FRAME
Page 1: ...Goulds Pumps Installation Operation and Maintenance Manual Model HT 3196 i FRAME ...
Page 2: ......
Page 147: ......