4.
Pour grout through the grout hole into the baseplate up to the level of the dam.
When you pour the grout, remove air bubbles from it by using one of these methods:
•
Puddle with a vibrator.
•
Pump the grout into place.
5.
Allow the grout to set.
6.
Fill the remainder of the baseplate with grout, and allow the grout to set for at least 48 hours.
1
5
4
2
3
Item Description
1.
Baseplate
2.
Grout
3.
Foundation
4.
Dam
5.
Bolt
Figure 19: Fill remainder of baseplate with grout
7.
Tighten the foundation bolts.
8.
Recheck the alignment.
4.5 Piping checklists
4.5.1 Fastening
WARNING:
Risk of serious personal injury or property damage. Fasteners such as bolts and nuts are criti-
cal to the safe and reliable operation of the product. Ensure appropriate use of fasteners during
installation or reassembly of the unit.
•
Use fasteners of the proper size and material only.
•
Replace all corroded fasteners.
•
Ensure that all fasteners are properly tightened and that there are no missing fasteners.
4.5.2 General piping checklist
Precautions
WARNING:
•
Risk of premature failure. Casing deformation can result in misalignment and contact with
rotating parts, causing excess heat generation and sparks. Flange loads from the piping
system, including those from the thermal expansion of the piping, must not exceed the
limits of the pump.
4.5 Piping checklists
30
Model 3296 EZMAG Installation, Operation, and Maintenance Manual