INSTALLER
installation Procedure
the installation procedure breaks down into the following
steps:
- positioning the appliance
- cutting the intake/discharge pipes to length
- installing the flue and air intake pipes, chosen among:
-- Concentric pipe kit L = 500mm (included)
-- Concentric pipe kit L = 900mm
-- Concentric pipe SPECIAL kit L = 900mm
- installing the combined intake/exhaust pipe terminal
- installing the gasket
- installing the heater itself
- electrical hookup
- gas line hookup
tyPe of installation Per uni cig 7129
We show below the types of pipe (intake and discharge)
installation, pursuant to UNI CIG 7129, for products with
the following structural and installation specifications.
wall mounting
(concentric pipes, combined terminal)
Important! Convection heaters are intended for
installation against the wall only (the intake and flue
pipes run through the wall).
Before starting the installation, make sure the diameters,
total lengths and the terminals of the pipes are match
those indicated on the Overall Measurements table.
installing tHe temPlate and bracket
- Place the paper template (included with the pipes
kit) onto the wall and check the clearances around the
appliance.
- Mark the hole
“a”
on the paper template (3).
- Make a small initial hole, then use a suitable cutter to
make the big hole for the pipes.
- Cut the pipes to length and fit them into the hole.
- Fit the protruding lip of the template (1) onto the pipes.
- Mark the hole
“b”
on the metal template and drill it,
then secure the template and bracket (2) to the wall.
- Level the horizontal bracket and mark the two external
holes
“c”
.
- Make the two holes
“c”
and secure the horizontal
bracket.
- Mark and drill the hole
“d”
and secure the template.
drill the hole as shown in the table.
sc
sV
se
sV
se
sc
Summary of Contents for Eco SC Series
Page 1: ...SC SV SE Wall gas stoves NATURAL...
Page 37: ...37 notes notes...
Page 38: ...38 notes...
Page 39: ...39 warranty...