Assembly guide for EASY ROOF EVOLUTION L-1
In
fo
rm
at
io
n
et
v
is
u
el
s
n
o
n
c
o
n
tr
ac
tu
el
s.
S
o
u
s
rés
er
ve
d
e
m
o
d
if
ic
at
io
n
s
tec
h
n
iq
u
es
s
an
s
p
réavi
s.
This document is the property of IRFTS. It shall not be reproduced or shared with third parties without IRFTS agreement
Annex n° 6
a) Position the two upper frames
5. Upper frame assembly and vertical interval adjustment
b) Position the upper double bracket without
screwing it in place
Model “L-1” 60 Cells 6” Portrait
79
Assembly with glazing stops
X
= Graduations on the tools
c) Put in place the glazing stop mounting tool L-1
in the (Ø6) of the upper double bracket
d) Put the glazing stop mounting tool L-1 in the (Ø6)
hole of the lower double bracket while choosing the
necessary pitch index between the frames
See page 75 for the definition of the right
interval in accordance with the length of the
module
0
INTERVA
L
(ex.
1655)
e) Screw the upper double bracket in place
f) Put all the lower double brackets in place (and the
central ones for 6 bracket assembly) for each frame (see
page 78)