Installation of leaning
batten
To ensure a good support where the frames overlap
it is necessary to set up and to fix a horizontal batten
every
three support battens (d)* for the assemblies
with 6 fixings, every 2 support battens (d)* for the
assembly with 4 fixings.
If no tiles
battens
exists in the zones described below, add
battens all over the width of the PV field.
Those
battens
will have the same
thickness as the support batten(d)*.
Position at 300 ± 50 mm of the
lower support batten.
It is imperative to make this operation for all the lines of frame of the PV field.
Model “L-1” 60 Cells 6” Portrait
12.3.3)
* Reference nomenclature
300
± 50mm
(Dimension Detail)
Reference support
batten
(view without the rafters and ltiles
batten)
(view without the tiles
batten)
(Left side of PV field)
(Right side of PV field)
Liteaux
with
to add
Liteaux
with
to add
Flooring with 6 fixings per PV
module
(view without the rafters and tiles
batten)
300 ± 50mm
300 ± 50mm
2 support
battens
2 support
battens
Flooring with 4 fixings per PV
module
3 support
battens
3 support
battens
300 ± 50mm
300 ± 50mm
38
Flooring
i
nstallation