Section 1, Overview
1-2
The Hurricane
®
Chinook Heating System
1.1 Unpacking the Hurricane
®
Chinook
Heating System
When you receive the Hurricane
®
Chinook Heating System:
1
Unpack it carefully.
2
Check each component against the shipping list to ensure that
you have everything and all parts arrived undamaged.
3
If you discover any missing or defective parts call ITR
immediately.
4
If you are not installing the Hurricane
®
Chinook Heating System
right away, secure all components so none will be misplaced.
5
Before installing the Hurricane
®
Chinook Heating System
read the rest of this Installation and Operating Manual
.
It
contains critical information for a proper installation
.
A properly installed Hurricane
®
Chinook Heating System is essential
for several reasons:
•
To ensure that you and/or your customers receive satisfactory
results and enjoy a warm, comfortable environment.
•
To ensure a trouble-free operation, a successful inspection and
testing process, and ease of future maintenance.
•
To protect your Warranty.
1.2 Protect Your Warranty
This manual reflects approved installation techniques, methods, and
materials, and applies only to ITR equipment. The Hurricane
®
Chinook Heating System is only guaranteed by ITR if the entire
system has been installed according to the requirements and
recommendations set out here.
This includes:
•
Deviations from the instructions in this Manual.
•
Changes to any piece of ITR-supplied equipment.
•
Substitution of a non-ITR approved component.