InisBofin Insert Boiler Multi-fuel Stove
14
Stove installation Manual
Specification
Output Kw
Water Kw
Room Kw
13.5-16.9
12.0-14.0
1.5-5.0
Flue Diameter
153mm 6”
Flue Gas Temperature
ºC
282-395
Fuels
Wood, eco fuels,
peat dried,
smokeless coal
Min distance to
combustibles
Above mm
Front mm
Floor mm
Sides mm
525
550
350
350
CO% @ 13%O2
0.29
Stove Mass Kg.
141
Minimum Flue Draft
25 Pa, 0.25mbar
Maximum boiler
pressure
2 Bar
Boiler fittings
1” BSP
Refuelling interval
1Hr wood,
2Hr M.S.F
The heat outputs as shown were
obtained using well-seasoned
hardwood using a refuelling time
of 1 hours. Similar results are
achieved using Smokeless coal
(MSF) over a 2 hour refuelling
period.
Health and Safety
precautions
Please ensure that the
installation of the stove complies
with all the requirements of the
relevant Health and safety at work
acts applicable.
Some materials used in fire cement
are caustic and contact with the
skin should be avoided. In case of
contact with the skin wash with
plenty of cold water.
If any structural work is required
for installation please take note
of the possible presence of
asbestos. If the presence of
asbestos is found to be the case
please contact a registered
asbestos removal firm.
In addition to installation
instructions supplied, the
requirements of BS.8303 and
BS.6461 Parts 1&2; 1984 must be
fulfilled. Also all local
authority bylaws and domestic
building regulations including
those referring to national and
European Standards regarding the
installation of solid fuelled
burning appliances, flues and
chimneys must be followed.