Following is a flow chart which summarizes the operations to be carried out during the installation and commissioning
phases of the Previdia Max system and indications regarding the manuals to refer to for each operation:

1.

Installation and cabling (refer to the Installation Manual)

2.

Initializing (refer to the Installation Manual)

3.

Configuration from the front plate (operations described in this manual)

4.

Troubleshooting (operations described in this manual)

5.

Connection to a PC and reading (refer to the Programming Manual)

6.

Configuring the parameters (editing data, refer to the Programming Manual)

7.

Writing data on the control panel and test (refer to the Programming Manual)

8.

Commissioning (operations described in this manual)

9.

System handover

10. Maintenance (operations described in this manual)

1.4

Operator classification - Access Levels

The control panel has 4 distinct access levels:

Level 1:  

Public level - this is the normal access level of the control panel and is the access level for building inhabitants

who are neither authorized to use the system nor instructed in its use.

At this level it is possible to view the information on the display and on the signalling LEDs, to interact using the buttons
and the touch screen to scroll through the information. The only operations allowed are:

• mute buzzer
• test signalling LEDs
• activate alarm signalling when an early-warning process is running

Level 2:  

Authorized users - this access level is for the system supervisors and is for authorized personnel who are

adequately instructed in the use of the system and its functions.

Access requires the use of a key or entry of a valid access code with sufficient access rights. In addition to the operations
described for level 1 it is also possible to carry out the following operations:

• mute alarm signalling devices
• rearm the control panel
• activate alarm signalling devices manually
• disable control panel elements
• place in test status one or more of the system elements

The system provides two additional sub-levels of authorized user:

-

Superuser level

 as for the previous one, with the added possibility of replacing a loop device and registering control 

panels to their account with the Inim Cloud service

-

Maintenance level

 as for the previous level, with the possibility to terminate the valve pulse, for models that support 

the extinction functions

Level 3:  

Programming - this access level is for specialized technical operators who carry out system configuration,

commissioning and maintenance.

Access requires entry of a valid access code with sufficient access rights after inserting a jumper which enables
programming. Refer to the manual for system configuration, commissioning and maintenance.

ONLY authorized technicians, appointed by the Manufacturer can, by means of special tools, carry out repair work on
the motherboard.

Level 4:  

ONLY authorized technicians, appointed by the Manufacturer can, by means of special tools, carry out repair

work on the motherboard.

Summary of Contents for PREVIDIA MAX

Page 1: ...Configuration manual 1 FIRE DETECTION AND EXTINGUISHANT SYSTEM MANUAL FOR SYSTEM CONFIGURATION COMMISSIONING AND MAINTENANCE EN 54 2 EN 54 4 EN 54 21 EN 12094 1 0051 0051 CPR 1863 cert N 991K...

Page 2: ...en goods or claims by any other party caused by defective products or otherwise arising from the incorrect or otherwise improper installation or use of this product This warranty applies only to defec...

Page 3: ...network address IFMNET 10 2 6 Addressing the repeaters 10 2 7 Enrolling loop devices IFM2L 11 2 8 Acquiring the configuration 13 2 9 Signal check and fault search 13 2 10 Factory data 13 2 11 Setting...

Page 4: ...4 Table of contents Fire detection and extinguishant system...

Page 5: ...ont of the mounted device Qualified personnel Personnel whose training expertise and knowledge of the products and laws regarding security systems are capable of creating in accordance with the requir...

Page 6: ...nalling LEDs activate alarm signalling when an early warning process is running Level 2 Authorized users this access level is for the system supervisors and is for authorized personnel who are adequat...

Page 7: ...3 4 Assign addresses to the system modules paragraph 2 4 5 Enroll loop devices on IFM2L modules and respective troubleshooting procedure paragraph 2 7 6 Set the defined configuration paragraph 2 8 7 C...

Page 8: ...n which appears on the screen The network parameters screen will be shown F Beside these there is the Backup panel option G If enabled the FPMCPU module you are using will be set as control panel back...

Page 9: ...ternal IFM modules on the left A FPM front plate modules on the right F A window will open H select the desired address in the programming field then tap on Set Note Addresses which exceed the maximum...

Page 10: ...and univocal address 2 6 Addressing the repeaters The procedure to configure the FPMCPU modules as repeaters depends on the type of connection between the modules and the control panel Connection via...

Page 11: ...nsumption mA 15 LOOP CLOSED Generic 1 Detectors 44 IN Modules 12 OUT Modules 5 IN OUT Modules 0 Sounder flashers 3 Call points 8 Loop reset Scan Show topology Esc Access level 2 01 01 2020 18 23 Loop...

Page 12: ...en by updating the alarm and fault indications of the devices shown restored fault events will not be shown L Button to perform a scan which will search the loop for devices and their serial numbers a...

Page 13: ...ttons on the back of the FPMCPU front plate module Press and hold the Factory data button A and press and release the Reset button B Following confirmation of the request to reset to the factory data...

Page 14: ...required revision of Previdia STUDIO configuration software SW site specific data release Data progressive number of system configuration upgrades FPMLED FPMPRN FPMEXT front plate modules the module...

Page 15: ...aller Property option If activated the installer reserves the management of accesses to the system by the Cloud If not activated this property is assigned to the first user enrolled 5 Press the Regist...

Page 16: ...the information provided is clear Ensure that the descriptions of the various zones points and system elements entered during the data entry phase are correct and that the information provided on the...

Page 17: ...Turn On LED buttons Note Testing devices by means of manual activation does not test functionality and efficiency of the cause effect association which determines their activation programming coheren...

Page 18: ...check for the presence of fault or alarm conditions which must be investigated 4 2 Testing the detectors As well as the tests which must be performed during the commissioning phase paragraph 3 2 Testi...

Page 19: ...Configuration manual 19...

Page 20: ...m Centobuchi via Dei Lavoratori 10 63076 Monteprandone AP Italy Tel 39 0735 705007 _ Fax 39 0735 704912 info inim biz _ www inim biz ISO 9001 Quality Management certified by BSI with certificate numbe...

Reviews: