![INIM Electronics PREVIDIA MAX Manual For System Configuration, Commissioning And Maintenance Download Page 17](http://html1.mh-extra.com/html/inim-electronics/previdia-max/previdia-max_manual-for-system-configuration-commissioning-and-maintenance_2061471017.webp)
Configuration manual
Commissioning
17
3.2
Testing to detectors and manual activations
All the installed detectors must be tested during the commissioning phase. It is necessary to check the capacity of each
detector to react to a simulated condition of fire, and to check the precision of the signals transmitted to the control
panel in response to its activation (description of the point and zone).
For this purpose it is possible to use the
Test
button of the control panel (
[A]
)
on the “Zone status” screen, accessible via the “System status” menu on the
home page.
By tapping this button it is possible to place one or more zones in test status.
The activation of a detector which belongs to a zone in test status will not
generate any alarm signalling or activate the outputs or signalling devices.
However, the control panel will activate the signalling LEDs on the detectors
and will perform automatic reset after a few seconds without any need of
further intervention by the operator on the control panel.
The activation of a point which belongs to a zone in test status will be recorded in the events log. Therefore, on
completion of the test on all the zone devices, the operator can check the congruence of the various indications by
means of the log.
The activation of all the manual call points (alarm buttons) must be tested in the same way as described for the detectors.
3.3
Testing signalling and activations
The functionality and efficiency of all the signalling devices must be checked
thoroughly.
It is possible to test such devices by activating the relative LEDs and outputs
manually at the control panel via the respective management page (
[B]
).
To reach this page you must access the “Points” section via the “System
status” menu on the homepage. Select the desired loop and point to be
tested from the lists shown then, by means of the relative
View
buttons go
to the management screen where you will find the
Turn On output
and
Turn
On LED
buttons.
Note:
Testing devices by means of manual activation does not test functionality and efficiency of the cause/
effect association which determines their activation (programming coherence of groups), therefore, it is
necessary to perform real functionality tests.
3.4
Testing the extinction system
Particular attention must be paid to the testing of eventual fire extinction systems.
Special attention must be paid to the functionality and safety of the extinguishing-agent release devices before
proceeding with the testing of all activation and stop-extinction procedures in accordance with the requirements of the
executive project.
3.5
Maximum time settings. Normative restrictions
During programming via the Previdia/STUDIO software you can set the time length or delay of many control panel
functions. The normative reference standards require maximum duration for the following parameters:
•
Prealarm time
, the maximum delay time is 10min (EN 54-2 - clause 7.11.1 (c)).
•
Verification time OFF (s)
, if the verification function is enabled for an input device, the time for which the device
remains deactivated after the first activation must be 60 seconds maximum (EN 54-2 - clause 7.12.1 [b]).
•
Verification time (s)
, if an input device has the alarm verification option enabled, the maximum verification time is 30
minutes (EN 54-2 - clause 7.12.1 [c]).
•
Lock reset time after released (min)
, the maximum time is 30 minutes (EN 12094-1:2003 - clause 4.12.2).
•
Pre-extinction time on automatic/manual activation
, the maximum time is 60 seconds (EN 12094-1:2003 - clause
4.17.2).
•
Valve ON time
, the maximum time is 300 seconds (EN 12094-1:2003 - clause 4.21).
Refer to the Previdia/STUDIO software programming manual for more details about the parameters listed above.
Zone status
N.
Description
Status
1
Zone 01
Stand-by
2
Zone 02
Fault
3
Zone 03
Stand-by
4
Zone 04
Stand-by
5
Zone 05
Alarm
6
Zone 06
Stand-by
Disable
Test
Esc
Access
level:2
01/01/2020
18:23
A
Loop module: 03 Point: 03 SNSNSNSNSN
Optical heat det.
Zone 02
Detector lost
Replace
Info
Turn On output
Real-time
Turn On LED
Camera
Disable point
Map
Disable zone
Esc
Access
level:2
01/01/2020
18:23
B