Commissioning

Fire detection and extinguishant system

Chapter 3

Commissioning

The commissioning phase is a set of tests and inspections which are necessary to ensure the full efficiency and proper
functioning of the system as specified in the system project. This phase is essential and must be performed in a
scrupulous way in accordance the regulatory requirements of the country where the system is installed and in full
respect of the recommendations in the following section.

Ensure the test and inspection procedures are performed only after checking the safety of the system and after having
verified that any device activations controlled by the system will not cause any conditions of danger, and that all the
building occupants who can be reached by the audible and visual signalling have been informed.

Ensure that the person who is responsible for the security of the building where the tests and inspections are to be
carried out has taken countermeasures to avoid any situations of panic or distress for the building occupants.

3.1

Testing the Control panel

It is necessary to check the functionality status of the frontplate by first checking the information supplied on the screen
and LEDs and then by inspecting the efficiency of the command devices (user-interface buttons, access keys, etc.):

• Check the functionality status of the screen and ensure that the information provided is clear.
• Ensure that the descriptions of the various zones, points and system elements entered during the data-entry phase are 

correct, and that the information provided on the screen clearly indicates any detectable conditions of danger.

• Check that there are no indications present of faults, alarms or anomalies of any type whatsoever. In the event of such 

indications, proceed with the removal of the causes of faults and anomalies.

• Check the status the functionality of the LEDs and buzzer. The front panel provides a button for the simultaneous 

activation of all the LEDs and buzzer thus allowing evaluation of their efficiency (refer to the description of the User 
Interface).

• Check the efficiency of the front-plate buttons and keys.
• Check the status of the power-supply sources (mains and batteries) and the consumption conditions of the control 

panel. The power-supply parameters can be checked by accessing the configuration menu (refer to 

paragraph 2.3 

Accessing the configuration menu

) and selecting the configured IFM24160 modules.

The sections show the voltages, currents and temperatures of the various elements:

[A]

Button for addressing the 

module

[B]

Section containing a list of 

current faults

[C]

Voltage and output current 

of the IFM24160 module

[D]

Battery parameters (internal 

resistance, voltage, status 

and current)

[E]

Internal temperature and 

battery charge voltages

Low battery voltage
Mains fault

PSU 1 Module

Change address

Exit
27.0 V
0.225 A

150 mOhm
26.2 V
28°C
Charging
0.222 A

33°C

37°C
27.2 V

Esc

Access 

level:3

01/01/2020

18:23

B

A

C

E

D

Summary of Contents for PREVIDIA MAX

Page 1: ...Configuration manual 1 FIRE DETECTION AND EXTINGUISHANT SYSTEM MANUAL FOR SYSTEM CONFIGURATION COMMISSIONING AND MAINTENANCE EN 54 2 EN 54 4 EN 54 21 EN 12094 1 0051 0051 CPR 1863 cert N 991K...

Page 2: ...en goods or claims by any other party caused by defective products or otherwise arising from the incorrect or otherwise improper installation or use of this product This warranty applies only to defec...

Page 3: ...network address IFMNET 10 2 6 Addressing the repeaters 10 2 7 Enrolling loop devices IFM2L 11 2 8 Acquiring the configuration 13 2 9 Signal check and fault search 13 2 10 Factory data 13 2 11 Setting...

Page 4: ...4 Table of contents Fire detection and extinguishant system...

Page 5: ...ont of the mounted device Qualified personnel Personnel whose training expertise and knowledge of the products and laws regarding security systems are capable of creating in accordance with the requir...

Page 6: ...nalling LEDs activate alarm signalling when an early warning process is running Level 2 Authorized users this access level is for the system supervisors and is for authorized personnel who are adequat...

Page 7: ...3 4 Assign addresses to the system modules paragraph 2 4 5 Enroll loop devices on IFM2L modules and respective troubleshooting procedure paragraph 2 7 6 Set the defined configuration paragraph 2 8 7 C...

Page 8: ...n which appears on the screen The network parameters screen will be shown F Beside these there is the Backup panel option G If enabled the FPMCPU module you are using will be set as control panel back...

Page 9: ...ternal IFM modules on the left A FPM front plate modules on the right F A window will open H select the desired address in the programming field then tap on Set Note Addresses which exceed the maximum...

Page 10: ...and univocal address 2 6 Addressing the repeaters The procedure to configure the FPMCPU modules as repeaters depends on the type of connection between the modules and the control panel Connection via...

Page 11: ...nsumption mA 15 LOOP CLOSED Generic 1 Detectors 44 IN Modules 12 OUT Modules 5 IN OUT Modules 0 Sounder flashers 3 Call points 8 Loop reset Scan Show topology Esc Access level 2 01 01 2020 18 23 Loop...

Page 12: ...en by updating the alarm and fault indications of the devices shown restored fault events will not be shown L Button to perform a scan which will search the loop for devices and their serial numbers a...

Page 13: ...ttons on the back of the FPMCPU front plate module Press and hold the Factory data button A and press and release the Reset button B Following confirmation of the request to reset to the factory data...

Page 14: ...required revision of Previdia STUDIO configuration software SW site specific data release Data progressive number of system configuration upgrades FPMLED FPMPRN FPMEXT front plate modules the module...

Page 15: ...aller Property option If activated the installer reserves the management of accesses to the system by the Cloud If not activated this property is assigned to the first user enrolled 5 Press the Regist...

Page 16: ...the information provided is clear Ensure that the descriptions of the various zones points and system elements entered during the data entry phase are correct and that the information provided on the...

Page 17: ...Turn On LED buttons Note Testing devices by means of manual activation does not test functionality and efficiency of the cause effect association which determines their activation programming coheren...

Page 18: ...check for the presence of fault or alarm conditions which must be investigated 4 2 Testing the detectors As well as the tests which must be performed during the commissioning phase paragraph 3 2 Testi...

Page 19: ...Configuration manual 19...

Page 20: ...m Centobuchi via Dei Lavoratori 10 63076 Monteprandone AP Italy Tel 39 0735 705007 _ Fax 39 0735 704912 info inim biz _ www inim biz ISO 9001 Quality Management certified by BSI with certificate numbe...

Reviews: