12. Pressure regulating valve with pressure sensor for glass scales sealing air
0.6-1.0 bar
Procedure
1. Check oil level at oiler (optional).
2. Check pressure setting on pressure gauge and adjust if necessary. An
operating pressure of 6 bar has been set at the factory.
3. Check supply and fluid lines (damage and leakage). Supply and fluid lines must
be checked for damage. Pre-damage such as kinks or abrasions should be
logged and replacement should be initiated.
4.
Example: Various silencer versions from FESTO
Check silencers.
5. Drain condensate (not applicable to auto-drain).
Maintenance Summary - Care activities
12
Maintenance Instructions
G220
DIE017EN - 05.06.2019
Summary of Contents for C200-sl
Page 8: ...Preface 4 Maintenance Instructions G220 DIE017EN 05 06 2019 ...
Page 101: ......