12. Pressure regulating valve with pressure sensor for glass scales sealing air
0.6-1.0 bar
Procedure
1.
Power off the machine to depressurize the pneumatic system
and secure against accidental switching on.
Check oil level at oiler (optional).
2. Check supply and fluid lines (damage and leakage). Supply and fluid lines must
be checked for damage. Pre-damage such as kinks or abrasions should be
logged and replacement should be initiated.
3.
Example: Various silencer versions from FESTO
Check silencer, replace if necessary.
4.
Dirty filter cartridges must never be cleaned but always
replaced. Filter cartridges are hazardous waste and must be
disposed of according to local regulations.
Only filters with a filter fineness described in the fluid plans must
be used.
Replace filter.
5.
Condensate is extremely harmful to the environment due to its
high pollution impact. Condensate must be collected in a
container specifically marked for this purpose and properly
disposed of.
Drain condensate (not applicable to auto-drain).
6. Switch on the machine.
7. Check the pressure setting on the system pressure gauge and adjust if
necessary. A pressure of 6 bar has been set at the factory.
8.
Dirty measuring systems or lack of sealing air can cause
damage to the machine.
Maintenance Summary - 4.000 Operating hours
68
Maintenance Instructions
G220
DIE017EN - 05.06.2019
Summary of Contents for C200-sl
Page 8: ...Preface 4 Maintenance Instructions G220 DIE017EN 05 06 2019 ...
Page 101: ......