Maintenance Summary - Care activities
It is recommended to document the maintenance activities carried out by using the appropriate
maintenance log. The maintenance log has the document number DIE018EN - 05.06.2019.
The maintenance interval is highly dependent on the production and environmental conditions of the
machine. The determination of the appropriate interval must be made by the operator.
The maintenance interval should be between once per shift and once a week!
- Check work area door and viewing glass
- Check hydraulic system (visual inspection)
- Check pneumatic system (visual inspection)
- Checking fill levels of the fluid tanks
- Clean and lubricate clamping device
- Check electrical lines (visual inspection)
- Visual inspection of all fluid lines and electrical cables
- Clean cooling lubricant outlet on clamping cylinder
- Clean filter screens on chip conveyor
- Check cooling lubricant (visual inspection)
- Check the cooling unit and the coolant
- Check work area light (visual inspection)
- Clean the work area
- Cleaning the chip conveyor
- Clean labyrinth ring of spindles
- Wassermann tool change system
Maintenance Summary - Care activities
6
Maintenance Instructions
G220
DIE017EN - 05.06.2019
Summary of Contents for C200-sl
Page 8: ...Preface 4 Maintenance Instructions G220 DIE017EN 05 06 2019 ...
Page 101: ......