- Check setting of electrical fuses
Carrying out the maintenance activities described below requires
special knowledge. For this reason, these maintenance activities
must only be carried out by staff that has received adequate training
by the machine manufacturer!
Procedure
1.
Danger
Electric shock
Power off the machine and wait approx. 30 minutes. Check with
a meter if there is still voltage applied to the intermediate circuit.
Check setting of electrical fuses – note this information in the electrical
diagrams.
Maintenance Summary - 4.000 Operating hours
102
Maintenance Instructions
ABC.2
DIE244EN - 15.08.2022