Procedure
1.
Danger
Pressurized fluids exiting from damaged or incorrectly
installed fluid lines.
General cuts or eye injuries.
Power off the machine and depressurize the hydraulic system
before any maintenance activities. Secure the machine against
being switched on. Wear personal protective equipment.
Check supply and fluid lines (damage and leakage). Supply and fluid lines must
be checked for damage. Pre-damage such as kinks or abrasions should be
logged and replacement should be initiated.
2. Check lubrication pressure and related sensors.
3. Activate lubrication pulse in the control ten times.
4. Monitor the area around the lubricating oil distributor for leakage.
Maintenance Summary - 4.000 Operating hours
73
Maintenance Instructions
ABC.2
DIE244EN - 15.08.2022