6.2 CHECKS TO BE PERFORMED
BEFORE STARTING THE UNIT.
Yes
No Comment
CHECKS T
O B
E P
ERFO
RMED B
EFO
RE S
TAR
T-UP
Are there transport damages?
The unit has been installed at level
The power supply voltage complies with the identification plate instructions
The electrical circuit cables have been properly sized
The unit has been earthed
The neutral conductor of the unit has been connected
All terminals are tight
All cables and thermistors were inspected for the presence of any tangled wires
All cover units are tight
All terminal units are in operation
All water valves are open
All fluid intake lines are properly connected
All air has been vented from the system
The pump is working in the right direction of rotation
The pump control has been properly interlocked to the heat pump
The unit (including fittings) has been inspected to detect any leaks: Locate, repair and report
any coolant leaks
All power supply voltages comply with the specifications on the coolant plate.