200 mm
300 mm
200 mm
500 mm
1000 mm
1000 mm
200 mm
300 mm
500 mm
500 mm
500 mm
200 mm
1-3
1-4
11
1.4.2 Service door.
Service door
1.4.3 Service space aimed at ensuring a
correct air flow.
Fig. 1-4 reproduces the minimum distances from
the wall, in order to ensure proper air flow on the
air heat exchanger*.
* Before positioning the unit (access to various components / panel opening / component replacement...), you must program the different maintenance interventions to be performed
Summary of Contents for AUDAX TOP
Page 1: ...AUDAX TOP 18 21 ErP IE Instruction and recommendation booklet 1 040572ENG...
Page 2: ......
Page 70: ......
Page 71: ......