EN
5 - ADJUSTMENTS AND SETTING-UP
SIR 52 MS52 P/F
5 - Pag. 8 / 22
OPERATIONS REQUIRED TO SET UP
"STAGGERED SPROCKETS WORKING MODE"
- Set parameter 18 "Guide working mode (0-1)" to
mode 1; see the "Keyboard Instruction Manual".
- Set the guide channel opening cylinder stroke as
follows:
• open rear guard (C);
• remove fork (D) and move nose (E) axially;
• insert the fork in the slot corresponding to the
required mode according to the scheme shown in
the table;
Guide channel
Configuration
*
Position
of
pin B
Slot
for
Fork D
Setting
for
staggered
channel
57 53
4
--
a
46 43
3
IV
b
33 33
2
III
c
19 19
1
II
d
- Close the sprockets by pressing the
button.
(*)The configuration of the guide channel must be carried out according to the bar feeder
tooling and to the lathe type.
INFORMATION:
If shaped bars (i.e. hexagonal or square bars) are loaded, revolving speed
should be reduced in order to prevent premature wear and tear of the sprockets.
Summary of Contents for SIR52 MS52 F
Page 2: ......
Page 4: ......
Page 6: ......
Page 20: ...EN 2 TECHNICAL INFORMATION SIR 52 MS52 P F 2 Pag 10 14 2 6 TECHNICAL INFORMATION ...
Page 24: ...EN 2 TECHNICAL INFORMATION SIR 52 MS52 P F 2 Pag 14 14 ...
Page 50: ...EN 4 HANDLING AND INSTALLATION SIR 52 MS52 P F 4 Pag 22 22 ...
Page 72: ...EN 5 ADJUSTMENTS AND SETTING UP SIR 52 MS52 P F 5 Pag 22 22 ...
Page 102: ...EN 6 USE AND OPERATION SIR 52 MS52 P F 6 Pag 30 30 ...
Page 148: ...EN 9 PART REPLACEMENT SIR 52 MS52 P F 9 Pag 16 16 ...
Page 174: ...EN 11 GUIDE CHANNELS BAR PUSHER REVOLVING TIPS SIR 52 MS52 P F 11 Pag 6 6 ...
Page 185: ...12 GRIPPERS SIR 52 MS52 P F EN 12 Pag 11 34 ...
Page 203: ...12 GRIPPERS SIR 52 MS52 P F EN 12 Pag 29 34 ...
Page 212: ...EN 13 LIST OF AFTER SALES CENTERS SIR 52 MS52 P F 13 Pag 4 4 ...