![Idex Pulseafeeder MicroVision Boiler Installation & Operation Manual Download Page 11](http://html1.mh-extra.com/html/idex/pulseafeeder-microvision-boiler/pulseafeeder-microvision-boiler_installation-and-operation-manual_3701992011.webp)
11
72-910-24 Revision H
LOW VOLTAGE CONNECTIONS
The low voltage connections are found on the low voltage (front panel) board (
Fig. 7
).
Use 22-24 AWG (,76 mm²) wire for: interlock, drum levels, dry alarm, and water meter connections.
These signal wires must be run separate from AC power lines.
Fig. 7
Low voltage signal wires, e.g., water meter, must be run separate from AC power lines.
Sensor (probe) Connection Input
The controller may be supplied with a Stainless conductivity sensor. Connect the wires to “Sensor
In” as shown
(Fig. 7)
.
* If you are using a sensor without temperature compensation, place a jumper wire
between the GRN and WHT connections in the SENSOR IN terminal block.