21
Installation and Servicing
SECTION 2 - INSTALLATION
2.11 MOUNTING THE BOILER - EXTERNAL
Ensure the
flue turret is
perpendicular to the
front of the boiler.
1.
Fit the flue turret. Refer to Section 2.14.
2.
Ensure the plastic plugs are rmoved from both the CH and DHW connections before mounting the boiler.
Note: Boiler may contain residual water.
3.
Lift the boiler onto the wall mounting plate (refer to the Introduction Section for safe handling advice), locating it over the two
tabs.
Note: Install service connections at this point.
1
3
INST
ALLA
TION
Summary of Contents for LOGIC+ SYSTEM S18
Page 2: ...2 Installation and Servicing...
Page 61: ...61 Installation and Servicing...
Page 72: ......