44
Installation and Servicing
SECTION 3 - SERVICING
3.15 FLAME DETECTION ELECTRODE REPLACEMENT
3.16 SPARK GENERATOR REPLACEMENT
1.
Refer to Section 3.9.
2.
Disconnect the leads from the spark
generator
3.
Gently push down the generator
to release the top clip from the gas
valve mounting bracket.
5.
Fit the new spark generator and re-
assemble in reverse order ensuring
that the the earth lead is replaced
6.
Check operation of the boiler .Refer
to Sections 2.25 & 2.26.
Flame Detection Electrode
12.5mm
Str
aig
ht
ed
ge
1.
Refer to Section 3.9.
2.
Remove the burner. Refer to Section 3.11.
3.
Unplug the flame detection lead from the
electrode.
4.
Remove the 2 screws retaining the detection
electrode.
5.
Remove the electrode.
6.
Fit the new flame detection electrode, using the
new gasket supplied.
7.
Reassemble in reverse order.
8.
Check the operation of the boiler. Refer to
Sections 2.25 & 2.26.
Spark Generator
3
2
2
SER
VICING
Summary of Contents for LOGIC+ SYSTEM S18
Page 2: ...2 Installation and Servicing...
Page 61: ...61 Installation and Servicing...
Page 72: ......