SERVICE & INTERIM BOILER WORK RECORD
It is recommended that your boiler and heating system are regularly serviced and maintained, in line with manufacturers’ instructions, and that the appropriate service /
interim work record is completed.
Service provider
When completing a service record (as below), please ensure you have carried out the service as described in the manufacturers’ instructions. Always use the
manufacturers specified spare parts.
SERVICE/INTERIM WORK ON BOILER
delete as appropriate
Date:
Engineer name:
Company name:
Telephone N
o
:
Max rate CO
ppm CO
²
%
CO/CO
²
Min rate CO
ppm CO
²
%
CO/CO
²
Where possible, has a flue integrity check been
undertaken in accordance with manufacturers’
instructions, and readings are correct?”
yes
Gas rate:
m
3
/h
OR
ft
3
/h
Were parts fitted?
delete as appropriate
Yes
No
Parts fitted:
System inhibitor concentration has been checked
and appropriate action taken, in accordance with
boiler manufacturers’ instructions. *
yes
n/a
Comments:
Signature:
*A System inhibitor efficacy test is required on every annual service in accordance with the
manufacturers’ instructions. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
*A System inhibitor efficacy test is required on every annual service in accordance with the
manufacturers’ instructions. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
*A System inhibitor efficacy test is required on every annual service in accordance with the
manufacturers’ instructions. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
*A System inhibitor efficacy test is required on every annual service in accordance with the
manufacturers’ instructions. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
*A System inhibitor efficacy test is required on every annual service in accordance with the manufacturers’
instructions. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
*A System inhibitor efficacy test is required on every annual service in accordance with the
manufacturers’ instructions. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
SERVICE/INTERIM WORK ON BOILER
delete as appropriate
Date:
Engineer name:
Company name:
Telephone N
o
:
Max rate CO
ppm CO
²
%
CO/CO
²
Min rate CO
ppm CO
²
%
CO/CO
²
Where possible, has a flue integrity check been
undertaken in accordance with manufacturers’
instructions, and readings are correct?”
yes
Gas rate:
m
3
/h
OR
ft
3
/h
Were parts fitted?
delete as appropriate
Yes
No
Parts fitted:
System inhibitor concentration has been checked
and appropriate action taken, in accordance with
b
oiler manufacturers’ instructions. *
yes
n/a
Comments:
Signature:
SERVICE/INTERIM WORK ON BOILER
delete as appropriate
Date:
Engineer name:
Company name:
Telephone N
o
:
Max rate CO
ppm CO
²
%
CO/CO
²
Min rate CO
ppm CO
²
%
CO/CO
²
Where possible, has a flue integrity check been
undertaken in accordance with manufacturers’
instructions, and readings are correct?”
yes
Gas rate:
m
3
/h
OR
ft
3
/h
Were parts fitted?
delete as appropriate
Yes
No
Parts fitted:
System inhibitor concentration has been checked
and appropriate action taken, in accordance with
boiler manufacturers’ instructions. *
yes
n/a
Comments:
Signature:
SERVICE/INTERIM WORK ON BOILER
delete as appropriate
Date:
Engineer name:
Company name:
Telephone N
o
:
Max rate CO
ppm CO
²
%
CO/CO
²
Min rate CO
ppm CO
²
%
CO/CO
²
Where possible, has a flue integrity check been
undertaken in accordance with manufacturers’
instructions, and readings are correct?”
yes
Gas rate:
m
3
/h
OR
ft
3
/h
Were parts fitted?
delete as appropriate
Yes
No
Parts fitted:
System inhibitor concentration has been checked
and appropriate action taken, in accordance with
boiler manufacturers’ instructions. *
yes
n/a
Comments:
Signature:
SERVICE/INTERIM WORK ON BOILER
delete as appropriate
Date:
Engineer name:
Company name:
Telephone N
o
:
Max rate CO
ppm CO
²
%
CO/CO
²
Min rate CO
ppm CO
²
%
CO/CO
²
Where possible, has a flue integrity check been
undertaken in accordance with manufacturers’
instructions, and readings are correct?”
yes
Gas rate:
m
3
/h
OR
ft
3
/h
Were parts fitted?
delete as appropriate
Yes
No
Parts fitted:
System inhibitor concentration has been checked
and appropriate action taken, in accordance with
boiler manufacturers’ instructions. *
yes
n/a
Comments:
Signature:
SERVICE/INTERIM WORK ON BOILER
delete as appropriate
Date:
Engineer name:
Company name:
Telephone N
o
:
Max rate CO
ppm CO
²
%
CO/CO
²
Min rate CO
ppm CO
²
%
CO/CO
²
Where possible, has a flue integrity check been
undertaken in accordance with manufacturers’
instructions, and readings are correct?”
yes
Gas rate:
m
3
/h
OR
ft
3
/h
Were parts fitted?
delete as appropriate
Yes
No
Parts fitted:
System inhibitor concentration has been checked
and appropriate action taken, in accordance with
boiler manufacturers’ instructions. *
yes
n/a
Comments:
Signature:
Summary of Contents for LOGIC+ SYSTEM S18
Page 2: ...2 Installation and Servicing...
Page 61: ...61 Installation and Servicing...
Page 72: ......