6
Response 80 / 100 / 120
- Installation
2
BOILER DIMENSIONS, SERVICES & CLEARANCES
all dimensions in mm (in.)
17.
The following minimum clearances must be
maintained for operation and servicing.
Additional space will be required for installation,
depending upon site conditions.
Side and Rear Flue
a. Provided that the flue hole is cut accurately,
e.g. with a core drill, the flue can be installed
from inside the building where wall
thicknesses do not exceed 600mm (24").
Where the space into which the boiler is
going to be installed is less than the length
of flue required the flue must be fitted from
the outside.
Installation from inside ONLY
b. If a core boring tool is to be used inside the
building the space in which the boiler is to
be installed must be at least wide enough to
accommodate the tool.
Boiler connections are made on the mounting frame. Refer to Frame
GENERAL
Front clearance
The minimum front clearance when built in to a
cupboard is 5mm (
1/4
") from the cupboard door
but 450mm (17
3/4
") overall clearance is still
required, with the cupboard door open, to allow
for servicing. See Table 4.
Distance X is 20mm for DHW pipes and safety valve outlet.
Distance X is 23.5mm for CH pipes and gas inlet.
Per side
5 mm
Top
160 mm
(depth of elbow and lift
Front
450 mm
clear of spigot space,
Bottom
150 mm
internal wall ring plate)
CLEARANCES
*
Bottom clearance
Bottom clearance after installation can be
reduced to 10mm in an adequately ventilated
enclosed cupboard. However, 150 mm must
be available for servicing.
Dimension y
Boiler only
with stand-
off brackets
139mm
169mm
(5 (
7/16
")
(6
5/8
")