19
Minimiser SE
- Installation
INSTALLATION
24 WALL MOUNTING TEMPLATE
Note.
The template shows the positions for the fixing holes and
the flue hole centres for standard installation and for using
the stand-off brackets. Care MUST be taken to ensure the
correct holes are drilled.
1.
Separate the templates.
2.
Tape both templates into the selected position, locating
template B through an extended centre line as shown -
ensure that it is the right way up for the flue hand
required.
3.
Ensure squareness by hanging a plumbline as shown.
4.
Mark onto the wall the following:
a
The two wall mounting plate screw positions
(choose one from each group) and the jacking
screw position.
b.
The position of the flue duct hole (see diagram
below, and template)
Note.
Mark the centre of the hole as well as the circumference
5.
Remove both templates from the wall.
23 FLUE ASSEMBLY - Exploded view
Note
.
If the boiler is to be fitted flush with
300mm kitchen units using the stand-off
brackets ensure the wall is marked to suit
this condition (the dotted flue hole outlines
on the template).
SIDE FLUE OUTLET
2.
When cutting the ducts
always use the cardboard
support cutting aid
provided.
1.
An optional flue duct extension kit is
required for wall thicknesses greater than
:
460 mm (18") for
RHS
flue
550 mm (21
1/2
") for
LHS
flue
(see Frame 14).
LEGEND
1.
Terminal.
2.
Weather seal.
3.
Duct assembly.
4.
No.8 x 8 self tapping
screw.
5.
Flue turret.
6.
M5 x 10 pozi-hex screw.
7.
Turret clamp.
8.
Turret seal.
Summary of Contents for minimiser SE 30
Page 1: ......