21
Minimiser SE
- Installation
INSTALLATION
SIDE FLUE OUT
LET
28 MOUNTING THE BOILER
29 CONNECTING THE FLUE TO THE BOILER
1.
Lift the boiler onto the wall mounting plate, as
shown.
2.
Check the boiler alignment using a spirit level
and adjust as necessary with the jacking
screw.
3.
Align the hole in the jacking plate with the pre-
drilled hole in the wall and fix in position with
the No.10 x 2" screw provided.
Note.
If the front of the boiler is to be flush with
the front of 300mm deep kitchen units then the
optional stand-off bracket kit should be used -
refer to the fitting instructions supplied with the kit.
Note.
BEFORE fitting the flue turret, fill the condensate siphon within
the boiler by pouring a cupful of water into the flue outlet A.
1.
Insert the flue assembly through the
prepared hole in the wall far enough to
allow the rubber seal to unfold
completely and form an adequate seal
on the outside wall.
2.
Pull the flue back and locate the flue
turret on the top of the boiler, ensuring
that the seal is in place.
3.
Secure the flue turret on top of the boiler
by inserting the open ends of the turret
clamp under the 2 studs and fixing it in
the middle with the single M5 x 10mm
pozi-hex screw provided.
4.
Flues over 1 metre long.
Fix the flue support bracket to the wall,
using the wall plug and wood screw.
For standard installations use the short
wood screw.
If the stand-off option is used, secure the
support bracket using the spacer bracket
and long wood screw.
5.
Now make good the inside wall face
around the flue.
Summary of Contents for minimiser SE 30
Page 1: ......