
Subject to technical changes | Valid as of January 2022
42
OPERATION AND USAGE
CALEO COLD/NEUTRAL
03
3. OPERATION AND USAGE
3.1. Initial start-up
This chapter explains the proper start-up as well as operation of the unit.
Before the initial start-up, a waiting period of at least two hours must be kept after the installation. This rest period ensures that any
oil that is located in the compressor capsule, which could have become displaced during transport, can run back to the compressor
(applies to self-contained cooling appliances).
The unit is pre-cleaned before delivery. Nevertheless, we still recommend that you clean the unit thoroughly with a suitable cleaning
agent or disinfectant (see Chapter 4.1.2) before start-up in order to remove any dirtying.
Danger from electrical voltage on live components
Before start-up, check the cable connections and power supply once again for correctness and contact.
DANGER
Summary of Contents for CALEO COLD
Page 1: ...Operating Manual CALEO COLD NEUTRAL 22A Translation of the original ...
Page 2: ...Subject to technical changes Valid as of January 2022 2 ...
Page 41: ...Subject to technical changes Valid as of January 2022 41 NOTES CALEO COLD NEUTRAL ...
Page 53: ...Subject to technical changes Valid as of January 2022 53 NOTES CALEO COLD NEUTRAL ...