ICP DAS, ZT-2570/ZT-2571 User Manual, Version 1.3
Page 24
Copyright @ 2013 by ICP DAS Co., Ltd. All Rights Reserved.
Step 6.
Once the module configuration has been completed, the message
“
The
Configuration was successful
”
will be displayed. Return the DIP switch to
the
“
ZBRUN
”
position and reboot the ZT-257x device.
ГК
Атлант
Инжиниринг
–
официальный
представитель
в
РФ
и
СНГ
+7(495)109-02-08 [email protected] www.bbrc.ru