Section 4: PREPARATION FOR OPERATION Page 17
OM-ZR-May15
Section 4: PREPARATION FOR OPERATION
General
When unloading and unpacking the power unit and equipment, use extreme care.
For your protection, make a thorough inspection of the unit immediately upon delivery. In case of any damage
or shortage, notify the transit agent at once and have the delivering carrier make a notation on the freight bill.
Rigging of Vibrator
A steel wire rope sling must be connected to the lifting pin of the vibration suppressor. The required strength
of this sling depends on the capacity of the crane and the work to be carried out. A safety factor of five is
recommended. Several turns of a smaller diameter cable will usually last longer than one turn of a larger
diameter cable. Consult a rigging expert or rigging handbook for guidance. Be aware of protocols, regulations,
and guidelines for rigging.
Wire rope failure or cable clamp slippage may result in injury or death.
Check cables and cable clamps daily.
!WARNING – Safety!
Installing Proper Remote-control Pendant
To use power unit with vibrator, install ZR vibrator remote control pendant
Emergency
Stop
Clamp
Light
Clamp
Switch
Actuator
Switch
Main
Circuit
Engine
Throttle
Amphenol™ Connection to Power Unit Control Panel
The remote-control pendant is connected to the power unit at the control panel with a multi-pin modular plug
and hand nut connection. The pendant control has switches for the clamp, vibrator, engine throttle,
emergency stop, clamp indicator light. The cable allows 50 feet of distance from the power unit. If pendant
cable needs to be connected to power unit, align modular plug and push together before tightening metal nut
on Amphenol™ connection.
!WARNING – Equipment!
Remote Pendant should not be left unattended while power unit engine is running. Be
cautious of damaging pendant cable or allowing controls to be submerged in water or
mud. Avoid stretching cable or shutting control panel door on cord.
Cable