Table 8. Appliance installation checklist (continued)
U
Task
Description
Where to find information
h
3a–1
Label and connect an Ethernet cable from the
server to the customer network.
This document: “Ethernet connections” on
page 30
h
3a–2
On an existing TSSC only: Label and connect
an Ethernet cable from the TSSC external
port to the customer network.
This document: “Ethernet connections” on
page 30
h
3a–3
If installing OpenStorage, label and connect
Ethernet cables from the server to the
customer host network.
This document: “Replication and OpenStorage
customer host network (Feature Code 3456)
connections” on page 33
h
3a–4
If installing VTL, label and connect Fibre
Channel cables from the server to the
customer host network.
This document: “Fibre Channel connections in
a stand-alone VTL configuration” on page 36
h
3a–5
Check all cable connections, including power
connections, to ensure that they are properly
seated before powering up the server.
Connections might have come loose during
shipment.
Visual check
h
3a–6
Cut the tie straps on the retention brackets.
Visual check
Section 3b: Apply cable labels and make cable connections, clustered installation
h
3b–1
Label and connect an Ethernet cable from
Server A to the customer network.
This document: “1 Gb Ethernet switch
connections” on page 50
h
3b–2
Label and connect an Ethernet cable from
Server B to the customer network.
This document: “1 Gb Ethernet switch
connections” on page 50
h
3b–3
On an existing TSSC only: Label and connect
an Ethernet cable from the external port of
the TSSC to the customer network.
This document: “KVM switch, TSSC, and
customer network Ethernet connections
(Feature Code 3456)” on page 55
h
3b–4
If installing VTL, label and connect Fibre
Channel cables from Server A to the customer
host network.
This document: “Fibre Channel connections in
a clustered VTL configuration” on page 60
h
3b–5
If installing VTL, label and connect Fibre
Channel cables from Server B to the customer
host network.
This document: “Fibre Channel connections in
a clustered VTL configuration” on page 60
h
3b–6
If installing OpenStorage, label and connect
Ethernet cables from Server A to the
customer host network.
This document: “1-Gb Ethernet switch
connections in an OpenStorage configuration”
on page 52
h
3b–7
If installing OpenStorage, label and connect
Ethernet cables from Server B to the customer
host network.
This document: “1-Gb Ethernet switch
connections in an OpenStorage configuration”
on page 52
h
3b–8
Check all cable connections, including power
connections, to ensure that they are properly
seated before powering up the server.
Connections might have come loose during
shipment.
Visual check
h
3b–9
Cut the tie straps on the retention brackets.
Visual check
Section 4: Power-up all components
Note:
For clustered systems, tasks 4-4 and 4-5 can be performed in parallel.
h
4–1
Turn on the breakers to power the PDUs.
This document: “Powering up the
components” on page 68
h
4–2
Power-up the disk expansion modules.
This document: “Disk expansion modules” on
page 68
22
IBM System Storage TS7650 ProtecTIER Deduplication Appliance: Installation Roadmap Guide
Summary of Contents for TS7650 PROTECTIER DEDUPLICATION APPLIANCE
Page 8: ...viii IBM System Storage TS7650 ProtecTIER Deduplication Appliance Installation Roadmap Guide...
Page 12: ...xii IBM System Storage TS7650 ProtecTIER Deduplication Appliance Installation Roadmap Guide...
Page 14: ...xiv IBM System Storage TS7650 ProtecTIER Deduplication Appliance Installation Roadmap Guide...
Page 18: ...xviii IBM System Storage TS7650 ProtecTIER Deduplication Appliance Installation Roadmap Guide...
Page 26: ...xxvi IBM System Storage TS7650 ProtecTIER Deduplication Appliance Installation Roadmap Guide...
Page 126: ...100 IBM System Storage TS7650 ProtecTIER Deduplication Appliance Installation Roadmap Guide...
Page 152: ...126 IBM System Storage TS7650 ProtecTIER Deduplication Appliance Installation Roadmap Guide...
Page 162: ...136 IBM System Storage TS7650 ProtecTIER Deduplication Appliance Installation Roadmap Guide...
Page 164: ...138 IBM System Storage TS7650 ProtecTIER Deduplication Appliance Installation Roadmap Guide...
Page 194: ...168 IBM System Storage TS7650 ProtecTIER Deduplication Appliance Installation Roadmap Guide...
Page 206: ...180 IBM System Storage TS7650 ProtecTIER Deduplication Appliance Installation Roadmap Guide...
Page 214: ...188 IBM System Storage TS7650 ProtecTIER Deduplication Appliance Installation Roadmap Guide...
Page 217: ......
Page 218: ...Part Number 95P8310 Printed in USA or Mexico GA32 0920 02 1P P N 95P8310...