222
RackSwitch G8000: Application Guide
•
The hosts receive multicast traffic as follows:
– Host 1 receives multicast traffic for groups (*, 225.10.0.11), (22.10.0.13,
225.10.0.13)
– Host 2 receives multicast traffic for groups (*, 225.10.0.11), (*, 230.0.2.1),
(22.10.0.13, 225.10.0.13), (22.10.0.3, 230.0.2.3)
– Host 3 receives multicast traffic for groups (*, 230.0.2.1), (22.10.0.3,
230.0.2.3)
•
The Mrouter receives all the multicast traffic.
Prerequisites
Before you configure IGMP Snooping, ensure you have performed the following
actions:
•
Configured VLANs.
•
Enabled IGMP.
•
Configured a switch or Mrouter as the Querier.
•
Identified the IGMP version(s) you want to enable.
•
Disabled IGMP flooding.
Configuration
This section provides the configuration details of the switches shown in
.
Switch A Configuration
1. Configure VLANs and tagging.
2. Configure an IP interface with IPv4 address, and assign a VLAN.
3. Configure STP. Assign a bridge priority lower than the default bridge priority to
enable the switch to become the STP root in STG 2 and 3.
RS G8000(config)#
interface port 1-5
RS G8000(config-if)#
tagging
RS G8000(config-if)#
exit
RS G8000(config)#
vlan 2,3
RS G8000(config-vlan)#
enable
RS G8000(config-vlan)#
member 1-5
RS G8000(config-vlan)#
exit
RS G8000(config)#
vlan 1
RS G8000(config-vlan)#
no member 1-5
RS G8000(config-vlan)#
exit
RS G8000(config)#
interface ip 1
RS G8000(config-ip-if)#
ip address 10.10.10.1 enable
RS G8000(config-ip-if)#
vlan 2
RS G8000(config-ip-if)#
exit
RS G8000(config)#
spanning-tree mode pvrst
RS G8000(config)#
spanning-tree stp 2 vlan 2
RS G8000(config)#
spanning-tree stp 2 bridge priority 4096
RS G8000(config)#
spanning-tree stp 3 vlan 3
RS G8000(config)#
spanning-tree stp 3 bridge priority 4096
Summary of Contents for RackSwitch G8000
Page 1: ...RackSwitch G8000 Application Guide...
Page 2: ......
Page 3: ...RackSwitch G8000 Application Guide...
Page 16: ...16 RackSwitch G8000 Application Guide...
Page 22: ...20 RackSwitch G8000 Application Guide...
Page 23: ...Copyright IBM Corp 2011 21 Part 1 Getting Started...
Page 24: ...22 RackSwitch G8000 Application Guide...
Page 54: ...52 RackSwitch G8000 Application Guide...
Page 55: ...Copyright IBM Corp 2011 53 Part 2 Securing the Switch...
Page 56: ...54 RackSwitch G8000 Application Guide...
Page 92: ...90 RackSwitch G8000 Application Guide...
Page 94: ...92 RackSwitch G8000 Application Guide...
Page 144: ...142 RackSwitch G8000 Application Guide...
Page 145: ...Copyright IBM Corp 2011 143 Part 4 Advanced Switch ing Features...
Page 146: ...144 RackSwitch G8000 Application Guide...
Page 148: ...146 RackSwitch G8000 Application Guide...
Page 182: ...180 RackSwitch G8000 Application Guide...
Page 184: ...182 RackSwitch G8000 Application Guide...
Page 212: ...210 RackSwitch G8000 Application Guide...
Page 258: ...256 RackSwitch G8000 Application Guide...
Page 286: ...284 RackSwitch G8000 Application Guide...
Page 294: ...292 RackSwitch G8000 Application Guide...
Page 298: ...296 RackSwitch G8000 Application Guide...
Page 310: ...308 RackSwitch G8000 Application Guide...
Page 311: ...Copyright IBM Corp 2011 309 Part 7 Network Management...
Page 312: ...310 RackSwitch G8000 Application Guide...
Page 320: ...318 RackSwitch G8000 Application Guide...
Page 332: ...330 RackSwitch G8000 Application Guide...
Page 334: ...332 RackSwitch G8000 Application Guide...
Page 345: ...Copyright IBM Corp 2011 343 Part 9 Appendices...
Page 346: ...344 RackSwitch G8000 Application Guide...
Page 357: ...Copyright IBM Corp 2011 Appendix C Notices 355 Taiwan Class A compliance statement...