HMC-Managed
System
Using
a
Single
Full
System
Partition
To
complete
an
installation
when
an
HMC
is
used
to
manage
a
full
system
partition
on
a
managed
system,
the
installer
must:
__
1.
Locate
the
installed
HMC.
If
the
HMC
is
not
already
installed,
install
it
now.
Refer
to
the
IBM
Hardware
Management
Console
for
pSeries
Installation
and
Operations
Guide
,
order
number
SA38-0590.
__
2.
Arrange
the
HMC
and
attached
devices
so
that
they
can
be
used
comfortably.
Refer
to
the
IBM
Hardware
Management
Console
for
pSeries
Installation
and
Operations
Guide
,
order
number
SA38-0590.
__
3.
Ensure
that
the
HMC
is
running.
Refer
to
IBM
Hardware
Management
Console
for
pSeries
Installation
and
Operations
Guide
,
order
number
SA38-0590.
__
4.
Connect
the
power
to
the
system.
Refer
to
“Step
17.
Connect
the
Power
Cords
to
the
Server”
on
page
25.
__
5.
Verify
the
system
operation
by
completing
the
procedures
in
Chapter
3,
“Verifying
the
Hardware
Operation,”
on
page
29.
__
6.
Verify
that
the
latest
firmware
and
adapter/drive
microcode
code
are
installed.
Refer
to
“Verify
that
the
Latest
Firmware
and
Adapter
and
Drive
Microcode
are
Installed”
on
page
36.
__
7.
Ensure
that
the
operating
system
is
installed:
If
an
operating
system
has
been
preinstalled
in
your
system,
go
to
the
next
step.
If
you
plan
to
install
the
operating
system
now,
see
the
installation
instructions
provided
with
the
operating
system.
v
The
operating
system
can
be
installed
from
a
CD
(if
a
CD-ROM
drive
is
installed).
For
this
method,
the
system
must
have
a
CD-ROM
drive.
v
The
operating
system
can
be
installed
from
a
Network
Installation
Management
(NIM)
server.
For
information
about
installing
AIX
from
a
NIM
server,
see
the
AIX
5L
Installation
Guide
and
Reference
,
order
number
SC23-4389.
__
8.
If
the
system
is
not
running,
start
the
system.
refer
to
the
IBM
Hardware
Management
Console
for
pSeries
Installation
and
Operations
Guide
,
order
number
SA38-0590
for
procedures
on
starting
the
system
from
the
HMC.
__
9.
Configure
the
network.
Perform
the
following
procedures:
__
a.
Configure
Inventory
Scout
Services
and
Service
Agent.
__
b.
Collect
vital
product
data.
__
c.
Transmit
vital
product
data.
For
more
information
about
performing
these
tasks,
refer
to
the
IBM
Hardware
Management
Console
for
pSeries
Installation
and
Operations
Guide
,
order
number
SA38-0590.
__
10.
Leave
this
installation
guide
with
the
system
administrator.
Chapter
4.
Completing
the
Installation
41
Summary of Contents for pSeries 650
Page 1: ...pSeries 650 Installation Guide SA38 0610 03 ERserver...
Page 2: ......
Page 3: ...pSeries 650 Installation Guide SA38 0610 03 ERserver...
Page 8: ...vi Eserver pSeries 650 Installation Guide...
Page 12: ...x Eserver pSeries 650 Installation Guide...
Page 14: ...xii Eserver pSeries 650 Installation Guide...
Page 22: ...6 Eserver pSeries 650 Installation Guide...
Page 138: ...122 Eserver pSeries 650 Installation Guide...
Page 142: ...126 Eserver pSeries 650 Installation Guide...
Page 150: ...134 Eserver pSeries 650 Installation Guide...
Page 152: ...136 Eserver pSeries 650 Installation Guide...
Page 164: ...148 Eserver pSeries 650 Installation Guide...
Page 170: ...154 Eserver pSeries 650 Installation Guide...
Page 182: ...166 Eserver pSeries 650 Installation Guide...
Page 186: ...170 Eserver pSeries 650 Installation Guide...
Page 189: ......
Page 190: ...Part Number 80P3834 Printed in USA November 2003 SA38 0610 03 1P P N 80P3834...