v
Select
Language
v
OK
Prompt
Power
On
Open
Firmware
OK
Prompt
This
profile
is
used
only
by
service
representatives
to
obtain
additional
debug
information.
When
this
selection
is
enabled,
the
system
boots
to
the
open
firmware
prompt.
To
learn
more
about
these
power-on
options,
see
the
IBM
Hardware
Management
Console
for
pSeries
Installation
and
Operations
Guide
.
System
Profiles:
The
System
Profile
option
powers
on
the
system
according
to
a
predefined
set
of
profiles.
Note:
The
profiles
are
activated
in
the
order
in
which
they
are
shown
in
the
system
profile.
Configuring
the
Network
Using
the
HMC:
To
to
complete
the
installation,
the
following
configuration
tasks
must
be
performed:
v
Configuring
Inventory
Scout
Services
v
Configuring
Service
Agent
v
Collecting
Vital
Product
Data
(VPD)
v
Transmitting
VPD
For
more
information
about
performing
these
tasks,
refer
to
the
IBM
Hardware
Management
Console
for
pSeries
Installation
and
Operations
Guide
.
Operator
Panel
Power-On
Method
Perform
the
following
steps
to
power
on
the
processor
subsystem
and
attached
I/O
subsystems
using
the
power
button
on
the
operator
panel.
1.
Open
the
rack
door.
Look
for
OK
in
the
operator
panel
display,
which
indicates
that
the
system
is
in
standby.
2.
Press
the
power
button
on
the
operator
panel.
The
power
LED
on
the
operator
panel
starts
blinking
at
a
fast
rate.
9xxx
checkpoints
appear
in
the
operator
panel
display.
When
the
power-on
sequence
is
complete,
the
following
events
have
occurred:
v
The
power
LED
on
the
system
operator
panel
stops
blinking
and
stays
on.
v
The
power
LEDs
on
the
I/O
subsystem
come
on
and
stay
on.
Chapter
3.
Verifying
the
Hardware
Operation
31
Summary of Contents for pSeries 650
Page 1: ...pSeries 650 Installation Guide SA38 0610 03 ERserver...
Page 2: ......
Page 3: ...pSeries 650 Installation Guide SA38 0610 03 ERserver...
Page 8: ...vi Eserver pSeries 650 Installation Guide...
Page 12: ...x Eserver pSeries 650 Installation Guide...
Page 14: ...xii Eserver pSeries 650 Installation Guide...
Page 22: ...6 Eserver pSeries 650 Installation Guide...
Page 138: ...122 Eserver pSeries 650 Installation Guide...
Page 142: ...126 Eserver pSeries 650 Installation Guide...
Page 150: ...134 Eserver pSeries 650 Installation Guide...
Page 152: ...136 Eserver pSeries 650 Installation Guide...
Page 164: ...148 Eserver pSeries 650 Installation Guide...
Page 170: ...154 Eserver pSeries 650 Installation Guide...
Page 182: ...166 Eserver pSeries 650 Installation Guide...
Page 186: ...170 Eserver pSeries 650 Installation Guide...
Page 189: ......
Page 190: ...Part Number 80P3834 Printed in USA November 2003 SA38 0610 03 1P P N 80P3834...