locations above the rail clamp where nut clips have been installed.
l.
Continue with step 7n on page 14.
m.
At the rear of the rack, install retention brackets
(A)
on the left and right rack flanges, as shown
in Figure 13 on page 14. Attach each bracket by applying M5 screws
(B)
to the two locations
directly above the rail clamp where nut clips have been installed.
Figure 12. Installing the cable management bracket
Installing the 5802 and 5877 expansion units: Details
13
Summary of Contents for Power System 5802
Page 1: ...Power Systems Installing the 5802 and 5877 expansion units GI11 4307 09...
Page 2: ......
Page 3: ...Power Systems Installing the 5802 and 5877 expansion units GI11 4307 09...
Page 6: ...iv Power Systems Installing the 5802 and 5877 expansion units...
Page 38: ...26 Power Systems Installing the 5802 and 5877 expansion units...
Page 52: ...40 Power Systems Installing the 5802 and 5877 expansion units...
Page 62: ...50 Power Systems Installing the 5802 and 5877 expansion units...
Page 63: ......
Page 64: ...Part Number 00L5079 Printed in USA GI11 4307 09 1P P N 00L5079...